My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003196
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:51:39 PM
Creation date
2/6/2020 10:29:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003196
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> ' <br /> � p 13 O� <br /> Inspector Name /ate}( ')"Io<eS date of Inspection <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> ` Project Location 610 North Hunter Street Stockton,CA Project Manager Jeanne Homsey <br /> VES Com onendt <br /> Momtonng Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 <br /> WW2 <br /> VW3 <br /> VW4 <br /> MW1 <br /> influent before dilution <br /> Influent after dilution <br /> Effluent NA NA <br /> System Status up/down C•SVafA' '/'310(- Dilution valve <br /> TO Cumulative Run Time 03340-C Propane% <br /> TO High/Low Temperature at Arrival 1445/igp Piping System D )e_ <br /> T O Vacuum at Arrival 22.x'"#, Pipe Size I D 2" <br /> f18WaGtw. <br /> C <br /> 1 r tes i cluding any adjustments ade to the VES system <br /> 5 -s a + t <br /> i �r - • <br /> d11,3 e ►�e��- 1 d� • w <br /> x AS <br /> Monitoring Point Pressure(psi) Flowrate(Ifm) Groundwater Sample Collected <br /> AS1 <br /> AS2 <br /> Influent NA <br /> System Status upldownc6,jr% Pipe Size I D 2" <br /> Piping System Particulate filters <br /> Notes including any adjustments made to the AS system <br /> t G� ` i 'r. 613 -Re <br /> ' m Groundwater Treatment Corti csnent` s <br /> Monitoring Point Pressure(psi) Total flow Groundwater Sample Collected <br /> Influent NA NA <br /> 1 Post vessel#1 NA <br /> Effluent NA <br /> ' Total Groundwater Discharged LEL Meter Reading <br /> Inspect piping system Particulate filters <br /> ' Notes including any adjustments made to the groundwater treatment system <br /> 1 <br /> 625961tableslremsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.