My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003197
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 11:59:39 AM
Creation date
2/6/2020 10:30:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003197
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' associated piping, and remediation well network at the site Table 3 provides the well completion detail A <br /> . more detailed description of each of the system components follows <br /> ' SVE System <br /> The current SVE equipment (i e , 300 standard cubic feet per minute (SCFM) thermal oxidizer) was <br /> ' installed at the site on April 7, 2005, replacing a previous SVE unit The SVE unit was connected to the <br /> existing 500-gallon propane above ground storage tank (AST) for supplemental fuel supply, necessary <br /> hoses, pipes, gauges to transfer the propane, subsurface piping and wellhead connections between the <br /> ' SVE remediation wells, the AS remediation wells and the fenced remediation equipment compound <br /> Four SVE remediation system wells (VWl through VW4) were originally utilized at the site VW1 is <br /> screened between 10 and 30 feet bgs V W2 is screened between 20 and 3 5 feet bgs VW3 and VW4 were <br /> screened between 15 feet bgs and 25 feet bgs Each SVE wellhead connection includes a gate valve, <br /> vacuum gauge, sampling port, and flow rate measurement port <br /> ' After the initial start-up operations for the original SVE system, VW3 was taken off line to reduce water <br /> production and VW4 was partially closed off but remained on line In July of 2004, the completions of <br /> V W 1 and V W2 were altered to further reduce produced water These wells now include stingers set at <br /> approximately 28 feet bgs and 32 feet bgs, respectively. <br /> ' MW 1 was converted to a vapor extraction well on February 10, 2004 The well completion of MW 1 was <br /> altered with a stinger set at approximately 32 feet bgs <br /> Water Treatment System <br /> The SVE/AS system, groundwater treatment and discharge system (as previously configured) were started <br /> up on December 20, 2003 A water treatment system is required for the produced water associated with <br /> ' the SVE wells <br /> Components of the water treatment system include the knockout tank, located within the remediation <br /> compound, one 1,000-gallon drop tank, three transfer pumps, two 2,000 pound canisters connected in <br /> series containing aqueous-phase granular activated carbon (GAC), associated piping, control valves, <br /> pressure gauges, flow meters, instrumentation and controls Treated water is pumped from the effluent <br /> ' end of the lag canister into a 100-gallon tank, where it is discharged to the sanitary sewer system located <br /> on the south side of the on site building <br /> ' During initial start up of the original vapor extraction system, approximately 25 gallons of groundwater <br /> per hour were extracted from the four vapor wells (VW1 —VW4) ATC closed the valves on VW1 and <br /> VW2 and only extracted from VW3 and VW4, which are screened approximately two feet above the <br /> current water level Seven gallons of groundwater per hour were extracted from VW3 and VW4 <br /> To operate the vapor extraction system more efficiently, ATC modified the vapor extraction system to <br /> ' include groundwater treatment and discharge to the City of Stockton sewer system (This is the <br /> groundwater that accumulates during operation of the vapor extraction side of the system ) ATC <br /> submitted the necessary permit application information for the discharge of treated groundwater and on <br /> November 6, 2002 the City of Stockton Department of Municipal Utilities (DW) issued the <br /> ' Groundwater Discharge Permit (GDP) Following the issuing of the GDP, approximately 50 feet of 3- <br /> inch diameter, ABS pipe was placed on the surface of the site from the remediation compound to a <br /> discharge point located inside the bathroom of the on-site building The ABS pipe was connected to the <br /> existing sewer discharge line by a California licensed plumber during the week of November 25,2002 <br /> s\env iro1625961quart1yl4gr-2005 doc 4 ATC ASSOCIATES INC <br /> 1 <br />