My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003201
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:25:28 PM
Creation date
2/6/2020 10:35:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003201
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> Inspector Name AkL)I_ �-Ibccs Date of Inspection <br /> Protect Name Farmer Property Project Number 54 62596 0001 <br /> Protect Location 610 North Hunter Street, Stockton, CA Project Manager Drew Van Allen ? <br /> VESC�omponent --.-7- _ r <br />' Monitoring Point Vacuum (Hg) I Flowrate(cfm) FID(ppm) Sampled <br /> VW1 ef f <br /> C <br /> VW2 <br />' VW3 CZ _ 4t'L <br /> VW4 ©.62 C R <br /> Influent before dilution Z, 41c, ToLb after dilution 2Z c --.x k4&. <br />' Effluent NA NA 5 xf -796 <br /> mvzk -2-2. C Com/ <br /> System Status up/down u 1 pDilution valve <br /> TO Cumulative Run Time 13 8195 ( Propane % 44;Z <br />' TO High/Low Temperature at Arrival l�3��i 3 Piping System C�4 <br /> TO Vacuum at Arrival Z2-"" Pipe Size I D 2" <br />' Notes including any adjustments made to the VES system <br /> a <br /> S, I'q fl[Eent <br /> Monstonng Point Pressure (psi) Flowrate (Ifm) Groundwater Sample Collected <br /> AS1 ' c) ~� <br /> AS2 41. 2- <br /> Influent <br /> .2Influent NA <br /> System Status up/down [�� p Pipe Size I D 2" <br />' Piping System CNk Particulate filters t"o-a-yLe4 <br /> Notes including any adjustments made to the AS system <br /> rvGsoundw►aterTeatrnent Ccs oc�ent <br /> t Pressure_(psi) Total flow Groundwater Sample Collected <br /> Monitoring Point ( ) p <br />' Influent NA NA <br /> Post vessel#1 NA <br /> Effluent NA <br /> Total Groundwater Discharged LEL Meter Reading <br /> Inspect piping system 011�- Particulate filters F-Z-p <br />' Notes including any adjustments made to the groundwater treatment system A - — <br /> • <br />' 625961tables/remsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.