Item# <br /> 601 Hired Geocon to review and rewrite our SPCC plan <br /> 606 Hired Geocon to review and rewrite our SPCC plan <br /> 612 Hired Geocon to review and rewrite our SPCC plan <br /> 613 The inspection of this tank will be include the SPCC plan being rewritten <br /> 614 Training for this is constant however specific training was done on 6/13/16 and documented <br /> and signed it will be kept in its own binder and readily available for review. <br /> 616 Training was done on 6/13/16 and will be done annually <br /> 712 The SPCC plan was written prior to the Tank being installed.The correct information will be <br /> included on the new SPCC plan being written by Geocon who was contracted to rewrite the SPCC plan. <br /> Test and inspections for this tank will be included with the new SPCC plan being written. Providing a <br /> copy of permit to operate to show the necessary test were done. <br /> 717 Testing for this year is being done on 7/25/16 <br /> 109 Copies have been found which are in blg 2 in Stockton kept by Scott Waller.We have put them <br /> in the book where the originals were missing. <br /> 110 Copies have been found which are in blg 2 in Stockton kept by Scott Waller.We have put them <br /> in the book where the originals were missing. <br /> 406 these are being disposed of using our hazardous waste removal contract Scott Waller has <br /> arranged for these to be picked up and disposed of. <br /> 605 These were immediately cleaned I have provided current pictures of their appearance these are <br /> not a hazardous containers. This is a secondary containment used while transferring fuel to the tanks. <br /> Any spills while transferring spills will be cleaned up immediately by the contractor delivering the fuel. <br />