Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION k <br /> ROJECT TAME &jMktY PROJECT NUMBER 644,2-1.-%.ocol WELL NO ' VJ <br /> PROJECT MANAGER TYPE OF WELL r�Monitoring Ertractlon Other <br /> RECORCED BY SAMPLED BY /ate DATE 1D3Z'&0 Z_ <br /> WELL RURGtNG INFORMATION � <br /> PURGE VOLUME PURGE METHOD <br /> Well sing Olameter <br /> 2-4nch 41nch Other --e'ader - Type <br /> Pum T e <br /> T--e4 <br /> Well Total Depth t feet below Tap of Casing,TO p <br /> Other - Speedy I <br /> Depth to Water Z '�? feet below Top of Casing,WL <br /> Hydrocarbon Cdors <br /> , es <br /> Water Column Length '��feet No <br /> Purge Volume Calc elation (Water Column Length x Mu1Mplier x No Volumes = Calculated Purge Volume) <br /> 0 17 � �_ 2G <br /> t 0� X X - Calculated Purge Volume = ZOO_gallons <br /> (WCL) (MutttplEer) (No Volumes) Actual Purge Volume = allcns <br /> Multroller (Castrrcx Diameter rirtcties1 = Galfensf6neaF footle Z=(317 4=a66 6=1 a a=26 I <br /> Groundwater Parameter Measurement: Meter Type)5 � <br /> raCalibrated _Yes—No <br /> TIME ELAPSED FLCWRATE DTW pH EC TURE101 Y REDOX COMMENTS <br /> TTME (GPN1 (ft) anhcslcm eg C (NTIJ) mV G <br /> C I I6.x z-Z- l <br /> t4lI I41 -- I � Ib. �.I r <br /> I Imo - I I611f 6.44 17 1. X I I 'sW, I <br /> p1 z� t IaZ 1 1 <br /> I I � <br /> I I I <br /> I I I I I I <br /> I I I I I i <br /> I <br /> I I I I <br /> i <br /> I I I I I <br /> i I I <br /> 1 I I I <br /> I I I <br /> i <br /> i <br /> I <br /> I I I I <br /> lv=ASSOCIATES INC <br /> ENmRONMFXrAL.GEOTECHNICAL ANO MATFMALS PROFESIONAL'. <br />�5 <br /> t <br /> s <br />