My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003210
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:02:40 PM
Creation date
2/6/2020 11:00:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003210
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> Inspector Name �' Date of Inspection C76 4� 03 <br /> • Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton CA Project Manager Drew Van Allen <br /> Cc71n Gnent <br /> Monitoring Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 Jp,o 0-Ott9'-1/0%r NO <br /> VW2 0 rpt / <br /> VW3 <br /> VW4 D ,>s, <br /> Influent before dilution 12 Q f 'n <br /> Influent after dilution <br /> Effluent NA NA <br /> System Status up/down v I? Dilution valve OF"-c T�r-C-) � C� <br /> TO Cumulative Run Time 'j0'64 Propane% <br /> T O High/Low Temperature at Arrival (tfSI/l 360 Piping System 0�[ <br /> TO Vacuum at Arrival Pipe Size I D 21- <br /> Notes <br /> "Notes including any adjustments made to the VES system <br /> /A: H <br /> A am�nerrt <br /> Monitoring Point I Pressure (psi) I Flowrate(lfm) I Groundwater Sample Collected <br /> AS 1 Q <br /> AS2 i <br /> Influent SS- 66 NA <br /> System Status upidown OF Pipe Size I D 2" <br /> Piping System 6V— Particulate filters r-4-- <br /> Notes including any adjustments made t7CUZC�-Zc- <br /> drount <br /> AS stem / <br /> ent Cant onent <br /> Monitoring Point I Pressure(psi) Total flow Groundwater Sample Collected <br /> Influent NA NA -09-03 <br /> Post vessel#1 NA -OY-03 <br /> Effluent NA �y 06-017-03 <br /> Total Groundwater Discharged / jam "l 1 3�_ p LEL Meter Reading <br /> Inspect piping system Particulate filters Zo 19rL�� <br /> Notes include any adjustments made to the groundwater tree ent system <br /> 62596/tables/remsysinspectio n <br />
The URL can be used to link to this page
Your browser does not support the video tag.