My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003211
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:30:14 PM
Creation date
2/6/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003211
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> REMEDIATION SYSTEM MONITORING SHEET <br /> Inspector Name 0*5 C� K", � & Date of Inspection j - I4—'n 3 <br /> . Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street, Stockton, CA Project Manager Drew Van Allen <br /> a <br /> Monitoring Point Vacuum (Hg) Flowrate(cfm) FID(ppm) Sampled <br /> VW1 <br /> VW2 <br /> ' VW3 <br /> VW4 <br /> Influent before dilution <br /> Influent after dilution <br /> Effluent NA NA <br /> System Status upldown ]Gti,rAJ Dilution valve <br /> ' <br /> TO Cumulative Run Time r Propane % <br /> T O High/Low Temperature at Arrival ,� Piping System 0-�-- <br /> T O Vacuum at Arrival Pipe Size I D 2" <br /> Notes including any adjustments made to the VES system <br /> AS Corn rtilefit <br /> Monitoring Point Pressure(psi)(p ) Flowrate (Ifm <br /> ) Groundwater Sample Collected <br /> AS1 A11A <br /> ' AS2 <br /> Influent , S NA <br /> System Status up/down to p Pipe Size I D 2„ <br /> Piping System e tl,-- Particulate filters a <br /> Notes including any adjustments made to the AS system <br /> Eoun s --Tie-i1rh aori onerit <br />' Monitoring Point Pressure(psi) Tota[flow Groundwater Sample Collected <br /> Influent NA NA <br /> Past vessel#1 NA <br /> 1 Effluent NA <br /> Total Groundwater Discharged , 2, $ZD,3 LEL Meter leading <br />' Inspect piping system Particulate filters <br /> Notes including any adjustments made to the groundwater treatment system <br /> Si-Lc- 4 -,t-fnw_I <br />' 62596/tables/remsysinspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.