My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003211
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
610
>
2900 - Site Mitigation Program
>
PR0541693
>
ARCHIVED REPORTS_XR0003211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:30:14 PM
Creation date
2/6/2020 11:02:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003211
RECORD_ID
PR0541693
PE
2960
FACILITY_ID
FA0023897
FACILITY_NAME
TOYOTA TOWN INC
STREET_NUMBER
610
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906033
CURRENT_STATUS
01
SITE_LOCATION
610 N HUNTER ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FARMER PROPERTY <br /> /r REMEDIATION SYSTEM MONITORING SHEET OA"rrt eJ 2-1-65 <br />' Inspector Name G C., J-: Date of Inspection d 645/03 <br /> Project Name Farmer Property Project Number 54 62596 0001 <br /> Project Location 610 North Hunter Street Stockton,CA Project Manager Drew Van Allen <br /> +;. 7 <br /> E <br />' Monitoring Point Vacuum (Fig) Flowrate(cfm) FID (ppm) Sampled <br /> VW1 <br /> VW2 AfIA <br /> Al <br /> Influent before dilution <br /> /3 0 � <br /> Influent after dilution <br /> Effluent NA NA <br /> System Status upldown Dilution valve <br />' T O Cumulative Run Time Propane % 77?o <br /> T O High/Low Temperature at Arrival 5011 n6 Piping System c5 K <br /> T O Vacuum at Arrival tO3 5� Pipe Size I D 2" <br /> iNotes including any adjustments made to the VES system /061 FIVT?,ST)+nJ5�TS <br /> nJ T g2,d.2 q1 7 <br /> j fS��w/tT <br />' gid_(,0 7 G4 6 rZ,LZ4% o 37A 774A)e- — ��p. �?u.,f�S„CAzz&,ys �7-,4AX _ <br /> a AS Sm anent <br /> Monitoring Point Pressure (psi) Flowrate(ifm) Groundwater Sample Collected <br /> AS1 �i • Z �cJdZ <br /> IJIA <br />' AS2 <br /> Influent � 72- NA <br /> System Status up/down t4l, Pipe Size I D 2” <br /> Piping System m tr Particulate filters <br />' Notes including any adjustments made to the AS system <br /> zJ S-T-Z HA S 71;�TuCtl � �LC,r. f90_ <br /> `= Groundwater Treatillert« oMD( <br /> nent <br />' Monitoring Point Pressure(psi) 'total flow Groundwater Sample Collected <br /> Influent NA NA 5 W f= ds- S'7- <br /> Post <br /> Post vessel#1 NA c Im 5 ,Z- <br /> Effluent NA C5 <br /> 659' iJPSS� `? lc-.5 VK z<9D J1;'2,61 <br /> Total Groundwater Discharged -)L- 93C9,-K LEL Meter Reading -3-97 <br />' Inspect piping system d)�,- At-c-iC —r-) Particulate filters /4z-c-y, vC,G�3 d�T <br /> Notes including any adjustments made to the groundwater treatment system <br /> -r �L":-Je- b Lel <br /> 62596/tables/remsysmspection <br />
The URL can be used to link to this page
Your browser does not support the video tag.