Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME-GI 1'YNeV �>•i1J. PROJECT NUMBER.6ZS y6,0Q 0) WELL NO <br /> PROJECT MANAGER _-D�i TYPE OF WELL +/ Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY A DATE CJ,/eo <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Welling Diameter <br /> , rnch flinch` Other Bader - Type <br /> Well Total Depth 3 746 feet below Top of Casing,7D 7�Pump - Type�k`l4(U flq I <br /> Other - Specify <br /> Depth to Water L 2 03 feet below Top of Casing WL <br /> Hydrpearbon Odors <br /> Water Column LengthIS,-13 feet <br /> Yes No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> J X Ow t E X _ _ -7' Calculated Purge Volume = _gallons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume gallons <br /> Multidwr (Cas4ng Diameter Inches = Gallonsilinear foot) 2=017 4=U6 6=15 B=26 <br /> Groundwater Parameter Measurement Meter Type 3SNalibrated V1 Yes_No <br /> TIME ELAPSED FLOWRATE OTW pH EC TURBIDITY REDOX COMMENTS <br /> TIME (GPK (Ff} anhoslcm (NTu) mV <br /> deq F 6 PI <br /> still I e• 7 �,� za, -7 3� <br /> ItIq ty I 2 l- ttC"vpI -22 $' <br /> I <br /> I I <br /> I <br /> I I I I I i <br /> I <br /> I <br /> i <br /> VMASSOCIATES INC. <br /> EWROMD}ENTAL,GEOTECHNICAL AND MATERIALS PROFESSIONALS <br />