My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
514
>
2900 - Site Mitigation Program
>
PR0505417
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:45:27 PM
Creation date
2/6/2020 11:28:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505417
PE
2950
FACILITY_ID
FA0006772
FACILITY_NAME
AMERICAN SAVINGS BLDG
STREET_NUMBER
514
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95242
APN
06004013
CURRENT_STATUS
02
SITE_LOCATION
514 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GERAGHTY & MILLER. INC. 3 <br /> The soil generated during the drilling activities will be.stockpiled onsite for proper <br /> disposal by Boston Chicken, Inc. Four discrete samples will be collected from the stockpiled <br /> soil and submitted to the.laboratory. The four discrete samples will be composited in the <br /> laboratory into one sample for analysis. The.water used during the drilling activities will be <br /> stored onsite in 55-gallon drums pending disposal by Boston Chicken, Inc. <br /> TASK 3: GROUNDWATER SAMPLING <br /> Each monitor well will be allowed to stabilize for a minimum of 48 hours prior to <br /> development and sampling. Water-level measurements will be collected from each new <br /> monitor well prior to development. The wells will be developed by purging a minimum of <br /> three casing volumes of water prior to sampling. The purged water will be stored in covered <br /> 55-gallon drums onsite prior to disposal by Boston Chicken,Inc. All equipment that will enter <br /> the well will be washed in a solution of phosphate-free detergent and water, and triple-rinsed in <br /> potable water. Following well purging, groundwater samples will be collected using a new <br /> polyethylene bailer for each well. Groundwater,samples for laboratory analysis will be <br /> collected in appropriate USEPA-approved containers,placed on ice, and transported to a State- <br /> certified laboratory, along with appropriate chain-of-custody documentation. <br /> TASK 4: LABORATORY ANALYSIS <br /> The soil and water samples collected during the field activities will be analyzed for-total <br /> petroleum hydrocarbons as gasoline (USEPA Method.8015, modified) and.volatile organic <br /> compounds (USEPA Method 8240). The project budget estimate below assumes that a total of <br /> three soil samples (one from each boring and the composite sample of the drill cuttings) and <br /> four water samples (one each from the proposed wells, a trip blank, and one from the water <br /> generated during drilling)will be analyzed. <br /> TASK 5: REPORT PREPARATION <br /> Following completion of field activities and receipt of all laboratory data, Geraghty & <br /> Miller will prepare a letter report of the results of the assessment activities. This report will <br /> include a description of the soil-sampling activities, a site plan showing the soil-sampling <br /> locations, and a summary of the results. The report will be limited to the data collected during <br /> the field activities. <br /> Project No. RCO291.001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.