Laserfiche WebLink
K k" KLE1 N FELDER <br /> December 17, 1992r.- <br /> File: 24-220152-DOQ <br /> ri t=CMs. Linda Turkette ' 3'2 <br /> San Joaquin County Department of Public Health E fl �_ ' i .'_ ;✓ <br /> Environmental Health Division �' T <br /> P.O. Box 2009 �r;+ i�SMs, <br /> Stockton, CA 95201 <br /> Subject: Initial Site Assessment and Remediation Work Plan <br /> San Joaquin General Hospital <br /> French Camp, California <br /> Dear Ms. Turkette: <br /> Enclosed is Kleinfelder's work plan to begin assessment and remediation at the T2/T3 site at <br /> the San Joaquin General Hospital in French Camp, California. As we discussed during the <br /> destruction of the municipal well at the hospital, Kleinfelder is proposing to install one boring <br /> to assess the vertical migration of the previously detected hydrocarbons, and three monitoring <br /> wells to assist with the lateral migration assessment and evaluate the potential that ground <br /> water may have been impacted. <br /> Based on RWQCB guidelines, these wells are proposed within approximately 10 feet of the <br /> tanks. If ground water appears to have been impacted, additional wells may be warranted. <br /> Kleinfelder will inform you of the results when they become available. <br /> San Joaquin County is planning on removing tanks T2 and T3. The tank removal contractor <br /> will be responsible for procuring the proper permits for the removal. Based on the assumption <br /> that the impact to soil has been relatively limited (both vertically and laterally), Kleinfelder <br /> currently anticipates remediating the soil during the tank removal. The tank removal <br /> contractor will over-excavate the impacted soil. The soil will then be remediated by recycling, <br /> biodegradation, or disposal at a proper facility. <br /> Kleinfelder appreciates your involvement in this project. Drilling and well installation will <br /> begin within two weeks of obtaining your approval. Tank removals should be scheduled <br /> within one month after drilling has begun. If you have any questions, please do not hesitate to <br /> call. <br /> Sincerely, <br /> KL ER, INC. <br /> Dana W. Booth <br /> Project Geologist <br /> F DWB:mb <br /> 1 <br /> Enclosure <br /> FWP2-92-25 <br /> C <br /> ht 1992 Kleinfelder, Inc. <br /> M7KLEIN3077 Fite Circle, Sacramento, CA 95827 (916) 366-1701 <br />