Laserfiche WebLink
KLEINFELDER <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> I EXECUTIVE SUMMARY . ... ..... 1 <br /> 2 BACKGROUND . . . .. 3 <br /> i <br /> 3 SOIL ASSESSMENT . 4 <br /> I <br /> 3.1 Drilling and Soil Sampling ..... .. . . ... . 4 <br /> 3.2 General Site Hydrogeology ...• • • ••. • . ...• .•. 5 <br /> 3.3 Qualitative Field Screening . 5 <br /> 3.4 Analytical Results 6 <br /> 4 GROUNDWATER ASSESSMENT ... . 7 <br /> 41 Monitoring Well Construction 7 <br /> 4.2 Monitoring Well Development and Sampling . . . 7 <br /> 43 Surveying . . 8 <br /> 44 Groundwater Gradient ... . . . 8 <br /> 45 Analytical Results .. . . . .. .. . 9 <br /> 46 Monitoring Well Destruction .. . 9 <br /> 5 TANK REMOVAL . . . . ... .... . . .. . . 11 <br /> 6 SOIL REMEDIATION 12 <br /> 61 Soil Excavation .. 12 <br /> 6 1 1 Excavation Venfication Sampling 12 <br /> ' 6 1 2 Excavation Soil Samples.Analytical Results 13 <br /> 62 Soil Aeration .. .. . .. 13 <br /> 6.2.2 Stockpile Analytical Results 14 <br /> 63 Aeration. . . .. . 14 <br /> ' <br /> 63.1 Soil Aeration Sampling... 14 <br /> 63.2 Soil Aeration Analytical Results 14 <br /> ' 7 CONCLUSIONS AND RECOMMENDATIONS 16 <br /> 8 LMMATIONS. 18 <br /> PLATES <br /> 1 - Site Location Map <br /> 2 - Underground Tank Location Map <br /> 3 - Monitoring Well and Boring Location Map <br /> 4 - TPH (G&D) Soil Map <br /> 24_220152-Doo/FR12-105 (1993) Page m of iv July 27, 1993 <br /> ' copyright 1993 Kteinfetder, Inc. <br />