Laserfiche WebLink
K1% KLEONFELDER <br /> 1 <br /> December 17, 1992 <br /> File: 24-220152-D00 n ru <br /> Ms Linda Turkette DEC 2 1 1992 <br /> San Joaquin County Department of Public Health ENVIRONMENTAL H EAL f H <br /> Environmental Health Division PERMIT/SERVICES <br /> P O. Box 2009 <br /> Stockton, CA 95201 <br /> Subject: Initial Site Assessment and Remediation Work Pian <br /> San Joaquin General Hospital <br /> French Camp, California <br /> Dear Ms Turkette <br /> Enclosed is Kleinfelder's work plan to begin assessment and remediation at the T2/T3 site at <br /> the San Joaquin General Hospital in French Camp, California As we discussed during the <br /> destruction of the municipal well at the hospital, Kleinfelder is proposing to install one boring <br /> to assess the vertical migration of the previously detected hydrocarbons, and three monitoring <br /> wells to assist with the lateral migration assessment and evaluate the potential that ground <br /> water may have been impacted. <br /> Based on RWQCB guidelines, these wells are proposed within approximately 10 feet of the <br /> tanks If ground water appears to have been impacted, additional wells may be warranted <br /> Kleinfelder will inform you of the results when they become available <br /> San Joaquin County is planning on removing tanks T2 and T3 The tank removal contractor <br /> will be responsible for procuring the proper permits for the removal Based on the assumption <br /> that the impact to soil has been relatively limited (both vertically and laterally), Kleinfelder <br /> currently anticipates remediating the soil during the tank removal The tank removal <br /> contractor will over-excavate the impacted soil The soil will then be remediated by recycling, <br /> biodegradation, or disposal at a proper facility <br /> Kleinfelder appreciates your involvement in this project. Drilling and well installation will <br /> begin within two weeks of obtaining your approval Tank removals should be scheduled <br /> within one month after drilling has begun If you have any questions, please do not hesitate to <br /> call <br /> Sincerely, <br /> KL DER, INC. <br /> Dana W. Booth <br /> Project Geologist <br /> DWB mb <br /> Enclosure <br /> FWP2-92-25 <br /> Coyngght 1992 Klemfelder, Inc <br /> KLEINFFLDEI2 3077 Fite Circle, Sacramento, CA 95827 (916) 366-1701 <br />