Laserfiche WebLink
k%J KLEINFELDER <br /> . Tabuiarized results of soil sample analysis with copies of certified analytical <br /> laboratory results, <br /> Tabularized results of ground water monitoring with copies of certified <br /> analytical laboratory results; <br /> Estimates of ground water gradient direction and water table contour maps for <br /> the ground water monitoring event, and <br /> Description and documentation of QA/QC procedures employed for field and <br /> laboratory work <br /> Three copies of the report will be submitted to Mr Steven Keeter of SJCDCP Two of <br /> the copies will be for internal distribution while the third will be for forwarding to <br /> SJCEHD <br /> LBUTATIONS <br /> Regulations and professional standards applicable to Kleinfelder's services are <br /> continually evolving Techniques are, by necessity, often new and relatively untried <br /> Different professionals may reasonably adopt different approaches to similar problems <br /> Therefore, no warranty or guarantee, expressed or implied, will be included in <br /> Kleinfelder's scope of service <br /> During the course of the performance of Kleinfelder's services, hazardous materials <br /> may be discovered Klemfelder will assume no responsibility or liability whatsoever <br /> for any claim, loss of property value, damage, or injury that results from pre-existing <br /> hazardous materials being encountered or present on the project site, or from the <br /> discovery of such hazardous materials <br /> Nothing contained in this work plan should be construed or interpreted as requiring <br /> Kleinfelder to assume the status of an owner, operator, generator, or person who <br /> arranges for disposal, transport, storage or treatment of hazardous materials within the <br /> meaning of any governmental statute, regulation or order SJCDCP will be solely <br /> responsible for notifying all governmental agencies and the public at large, of the <br /> existence, release, treatment or disposal of any hazardous materials observed at the <br /> project site, either before or during performance of Kleinfelder's services SJCDCP <br /> will be responsible for all arrangements to lawfully store, treat, recycle, dispose, or <br /> otherwise handle hazardous materials, including cuttings and samples resulting from <br /> Kleinfelder's services. <br /> I <br /> This work plan may be used only by the client and only for the purposes stated, within <br /> a reasonable time from its issuance Land use, site conditions (both on site and off <br /> site) or other factors may change over time, and additional work may be required with <br /> the passage of time <br /> i <br /> FWP2-92-25 Page 4 of 4 24-220152-Doo <br /> Copynght 1992 Klemfelder, Inc <br />