My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003271
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
3500 - Local Oversight Program
>
PR0545287
>
ARCHIVED REPORTS_XR0003271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:34:44 PM
Creation date
2/6/2020 12:00:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003271
RECORD_ID
PR0545287
PE
3528
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
02
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} <br /> r� <br /> Aak <br /> qW 'q KLEINFELDER <br /> A-2 4 Sample Handling <br /> After labeling, the sample is immediately stored in an iced cooler for transport to <br /> Kleinfelder's office sample control or to the analytical laboratory. A Kleinfelder chain-of- <br /> custody form accompanies the cooler The chain-of-custody form includes Kleinfelder's <br /> name, address and telephone number, the employee number of the individual who <br /> performed the sampling, the sample numbers, the date and time the samples were <br /> collected, the number of containers each sample occupies, and the analyses for which the <br /> samples are being submitted, if any The chain-of-custody form is signed by each person <br /> who handles the samples, including all Kleinfelder employees and the receiving employee <br /> of office sample control or the analytical laboratory when the samples are delivered <br /> A-2.5 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are <br /> steam cleaned prior to drilling each boring In addition, sampling equipment is cleaned <br /> with trisodium-phosphate wash and rinsed with distilled water prior to collecting each soil <br /> sample <br /> A-2 d Soil Cutting Disposal <br /> Drill cuttings will be placed in 55-gallon drums or wrapped in plastic and left on site for <br /> disposal by the site owner If requested, Kleinfelder can coordinate disposal of soil after <br /> analytical results are available. <br /> . 1-2 7 Soil Boring Closure <br /> Upon completion of drilling and sampling, soil borings will be closed by backfilling with a <br /> cement/bentonite grout <br /> 1 <br /> ,. <br /> FR25-91-22 Page A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.