My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:17:41 PM
Creation date
2/6/2020 3:24:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interim Remediation Work Plan <br /> 419 S.Main Street,Manteca,CA <br /> June 25,2003 <br /> Page 5 <br /> MW-4 and MW-5 will be destroyed by over drilling the wells with 8-inch outside diameter, continuous- <br /> "' flight, hollow-stem auger and removing all well construction materials. Both monitor wells were completed <br /> to a depth of approximately 20 feet b s. The traffic boxes will be removed prior to over drilling the wells. 'v''� <br /> he resulting o—nngs will be ac filled with neat cement to the ground surface. The neat cement will be W q <br /> tremied into the borehole from the bottom of the borehole to the surface. The traffic boxes and well <br /> materials will be removed from the site. -to 2,_ <br /> KW.6 <br /> 4.3 DRILLING PROCEDURES <br /> One groundwater monitor well will be installed at the site in the vicinity of MW-4 as a replacement for <br /> MW-4. The proposed location of the replacement monitor well is shown on Figure 2 in Appendix A. <br /> The monitor well boring will be drilled using 8-inch outside diameter, continuous-flight,hollow-stem auger. <br /> The hollow-stem auger and other down-hole equipment will be decontaminated by steam cleaning prior to <br /> drilling. The monitor well boring will be drilled to approximately 8 feet below the water table. It is <br /> anticipated the total depth of the well boring will be approximately 25 feet bgs. All drilling activities will be <br /> .� observed by a Condor geologist. OK b"j.- 1-t W S k, --h ' '_. <br /> Drill cuttings from the monitor well boring will be logged according to the USCS. Descriptions of soil <br /> types encountered and any other pertinent field observations will be recorded on boring logs. Cuttings will <br /> be placed in a polyethylene bag and checked with a PID for the presence of volatile hydrocarbons. All <br /> visual observations and PID measurements will also be noted on the boring logs. <br /> The drill cuttings and steam cleaning effluent will be placed in DOT-approved 55-gallon drums, sealed, <br /> labeled, and left on-site pending laboratory analyses. Disposal of hazardous materials, if any, will be the <br /> responsibility of the property owner. <br /> i <br /> 4.4 MONITOR WELL MW-4 REPLACEMENT WELL INSTALLATION <br /> `, The monitor well will be constructed with 10 feet of 2-inch outside diameter, Schedule 40, flush-threaded, <br /> machine-slotted PVC screen (slot size 0.010). A flush-threaded PVC bottom cap will be placed at the <br /> bottom of the screen section. Blank PVC casing will be installed above the screen to the ground surface. <br /> L <br /> A filter pack of#3 Monterey sand will be placed in the annular space to approximately three feet above the <br /> screen while the auger is in place. The depth of the sand in the well annulus will be monitored with a <br /> v weighted tape measure while the sand is being placed and the auger is being gradually retracted to avoid <br /> bridging. To form a protective seal, approximately three feet of bentonite pellets will be installed above the <br /> sand as the augers are retracted. The bentonite will be hydrated using potable water. A surface seal of neat <br /> cement will be poured into the annulus and will extend from the bentonite to the ground surface. Depending <br /> on the stability of the borehole, the augers may be removed before or during emplacement of the grout. The <br /> monitor well will be completed at the surface with flush mount locking traffic box. A proposed well <br /> i <br /> construction diagram is shown on Figure 4 in Appendix A. <br /> At least 48 hours following construction, the monitor well will be developed by surging and bailing the <br /> groundwater in each well until the discharge water is relatively free of sediment (clear to the unaided eye). <br /> `W The monitor well will be purged until the temperature, electrical conductivity, and pH of the water has <br /> stabilized. All well-development equipment will be cleaned prior to use in the well by washing in a solution <br /> i <br /> of laboratory-grade, non-phosphate detergent and deicnized water, and double rinsing with deionized water. <br /> v <br /> 1 a <br /> i� CONDOR <br />