Laserfiche WebLink
Site Background <br /> Boyett Petroleum(419 S.Main'St.,Manteca) <br /> Page 5 of 5 <br /> Laboratory analytical results for the groundwater samples.collected at the site on March 21, 2003, <br /> indicate that MTBE.was detected in the groundwater samples collected from MW4, MW-7, and-MW-9, <br /> TAME was detected in the groundwater samples collected from MW-1 and MW-T Static.water level <br /> measurements collected on March-21, 2003, generally indicated a groundwater .flow direction to the <br /> west/southwest, a reversal from that reported in,the Fourth Quarter Monitoring Report December 2002, <br /> dated February 12, 2003. <br /> In the First Quarter Groundwater Monitoring Report, March 2003 Condor recommended the preparation <br /> of a problem assessment work plan (PAWP) to further investigate the lateral and vertical extent of <br /> groundwater contamination at the site; and the completion of a door-to-door survey.of potential:receptors <br /> within -the residential area of the site to attempt to identify the presence-of pumping wells in the site <br /> vicinity. <br /> On May 15, 2003, a meeting was held at the SJCEHD offices between Condor and SJCEHb <br /> representatives to discuss Condor's recommendations and address concerns the SJCEHD had regarding <br /> the site. In a_letter dated May 29, 2003, the SJCEHD directed the submittal of two individual work plans <br /> to install, test, and operate an interim remediation system and to adequately define the lateral and vertical <br /> extent of the contamination plume at the site. The SJCEHD agreed with Condor's recommendations to(1) <br /> conduct a door-to-door survey..of potential receptors, (2)redevelop MW-1,.MW-2, MW-3, MW-6, MW- <br /> 7, MW-8, and MW-9, (3) destroy-both damaged and consistently dry wells MW-4 and MW=S, and replace <br /> MW-4 with a new monitor well in the same area, and (5) conduct a monthly monitoring and sampling <br /> schedule over a-consecutive six month period to characterize the fluctuation of MTBE concentrations in <br /> groundwater: In addition,,the SJCEHD recommended than the design of MW-1 be reviewed within the <br /> context of&site conceptual model to determine if MW=1 potentially creates a vertical conduit between' <br /> lithologic units and to submit a work plan for well replacement if appropriate. <br /> Pa3761 Boyett Manteca�3761A Boyett Manteca Well Installation\Work PlansUnterim Remed.Work Plan\Site Background.doc <br />