My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
3500 - Local Oversight Program
>
PR0545347
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 4:17:41 PM
Creation date
2/6/2020 3:24:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545347
PE
3528
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
02
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
logo <br /> Additional Groundwater Investigation Work Plan <br /> rr 419 S.Main Street,Manteca,CA <br /> June 25,2003 <br /> Page 3 <br /> plume at the site. This work plan addresses the work necessary to adequately define the extent of the <br /> %" contaminant plume. Detailed site background information is included in Appendix B. <br /> 3.0 CPT AND DIRECT PUSH BORINGS <br /> This section includes a description of the site preparation and CPT and direct push boring procedures to be <br /> used for collecting groundwater samples. Laboratory analytical results of the groundwater samples will be <br /> used to determine the lateral and vertical extent of groundwater contamination at the site. <br /> 3.1 SITE PREPARATION <br /> Condor will complete boring permit applications and an encroachment permit application and obtain the <br /> required permits from the SJCEHD and the City of Manteca prior to the commencement of fieldwork. <br /> Condor will schedule and coordinate all field activities through the property owner (Boyett), the SJCEHD, <br /> L and the City of Manteca. The proposed boring locations will be marked with white paint and Underground <br /> Service Alert (USA) will be notified at least 72 hours in advance of the fieldwork to locate, identify, and <br /> mark underground utilities in and near the work area. However,because companies contacted by USA may <br /> not identify utilities past private property lines and into the site, it is the responsibility of Boyett to locate, <br /> identify, and mark any utilities on their property. <br /> 6W Condor will supervise the advancement of four deep CPT boring pairs (eight borings total—two at each of <br /> two locations) and five shallow direct push (hydropunch) borings to further investigate the lateral and <br /> vertical extent of groundwater contamination at the site. Prior to commencement of each day of fieldwork, a <br /> +� tailgate safety meeting will be held and a site specific Health and Safety Plan will be discussed with, and <br /> presented to, all field personnel for their signatures. <br /> 3.2 CPT BORING PROCEDURES <br /> CPT boring pairs will be advanced at four locations to an anticipated depth of approximately 125 feet bgs. <br /> Two CPT boring pairs will be advanced to evaluate the vertical extent of groundwater contamination in the <br /> `" immediate vicinity of the USTs. A third CPT boring pair will be advanced to evaluate the vertical extent of <br /> groundwater contamination in the predominant down-gradient direction of the USTs in the vicinity of <br /> monitor well MW-7. The fourth CPT boring pair will be advanced to evaluate the vertical extent of <br /> groundwater contamination at the anticipated leading down-gradient edge of the plume. The boring <br /> immediately west of the site property boundary is located on private property. The proposed CPT boring <br /> pair locations are shown in Figure 3, Appendix A. It is possible that the borings will meet refusal before the <br /> anticipated total depth is reached. <br /> At each CPT boring pair location, the first boring of each pair will be used to investigate the lithology of <br /> �+ the site at that location. An electric piezocone will be pushed downward into the subsurface by the CPT rig. <br /> Measurements of the cone bearing pressure, sleeve friction, and dynamic pore water pressure will be <br /> recorded at approximately two-inch intervals to provide a nearly continuous geophysical log. The lithologic <br /> �+ interpretations from the CPT borings will be compared and correlated to identify potential horizons that are <br /> laterally extensive and relatively conductive of groundwater(clean sand) and/or potential horizons that may <br /> act as relative groundwater flow barriers (clay and silt) <br /> i.r <br /> The second boring at each pair location will be advanced within a few feet of the first boring to collect <br /> discrete groundwater grab samples from horizons identified in the geologic logs from the first borings. <br /> N4� <br /> CONDOR <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.