Laserfiche WebLink
F <br /> Site Background <br /> Boyett Petroleum(419 S.Main St.,Manteca) <br /> Page 5 of 5 <br /> Laboratory analytical results for the groundwater samples collected at the site on March 21, 2003, <br /> indicate that MTBE was detected in the groundwater samples collected from MW-1, MW-7, and MW-9. <br /> TAME was detected in the groundwater samples collected from MW4 and MW-7. Static water level <br /> measurements collected on March 21, 2003, generally indicated a groundwater flow direction-to the <br /> west/southwest, a reversal from that reported in°the Fourth Quarter Monitoring Report December 2002, <br /> dated February 12, 2003. <br /> In the First Quarter Groundwater Monitoring Report,March 2003 Condor recommended the preparation <br /> of a problem assessment work plan (PAWP) to further investigate the lateral and vertical extent of <br /> groundwater.contamination at the site;and the completion of a door-to-door survey of potential receptors <br /> within the residential area .of the site to attempt to identify the presence of pumping wells in the site, <br /> vicinity. <br /> On May 15, 2003, a meeting was held at the SJCEHD offices between Condor and SJCEHD <br /> representatives to discuss Condor's recommendations and address concerns the SJCEHD had regarding <br /> the site. In a letter dated May 29, 2003, the SJCEHD directed the submittal of two individual work plans <br /> to install, test, and operate an interim remediation system and to adequately define the lateral and vertical <br /> extent of the contamination plume at the site. The SJCEHD agreed with Condor's recommendations to(1) <br /> conduct a door-to-door survey of potential receptors, (2)redevelop MW-1, MW-2, MW-3, MW-6, MW- <br /> 7, MW-B, and MW-9, (3)destroy both damaged and consistently dry wells MW-4 and MW-5; and replace <br /> MW-4 with a new monitor well in the same area, and (5) conduct a monthly monitoring and sampling <br /> schedule over a consecutive six month period to characterize the fluctuation of MTBE concentrations in <br /> groundwater. In addition, the SJCEHD recommended that the design of MW-1 be reviewed within the <br /> context of a site conceptual model to determine if MW-1 potentially creates a vertical conduit between <br /> lithologic units and to submit a work plan for well replacement if appropriate. <br /> .� P:\9761 Boyett Manteca\3761A Boyett Manteca Well Installation\Work Plans\CPT Work Plan\Site Background doc <br /> �r <br /> 1 � _ <br />