LBoyett Petroleum May 18, 2000 <br /> 419 South Main Street, Manteca, California Page 3 <br /> Work Plan for Lateral Extent <br /> Lof Groundivater Contamination (Addendum) <br /> present in the soil samples collected from the monitoring wells until the point of the <br /> soil/water interface (capillary fringe). <br /> WHF proposes five (5) shallow soil borings, four (4) will be to a depth of approximately <br /> twenty-five feet (25'), thereby not violating the clay layer that is present between twenty-six <br /> feet (26') and twenty-nine feet (29'). These four (4) borings will be converted <br /> r monitoring wells to confirm the presence or absence petroleum car ons in the <br /> �•, groundwater underlying the site. A single soil boring not o be converted to a monitoring <br /> well) will be completed to a depth of approximately fift eet (50') to determine the vertical <br /> extent of soil and groundwater contamination. The number of borings/monitoring wells, +o /� Uj <br /> and the depths of the wells, may be increased based on the field observations and the <br /> judgement of the on-site professional from VaIF, Inc. at the time of drilling. <br /> LThe locations of these monitoring wells are shown in Figure 3 and are described below: <br /> L • One MW placed north of MWA <br /> • One MW placed west of MW-1 along the western fence line. <br /> • One MW placed to the south of MW-1 along the western wall of the Mini Mart <br /> L • One MW placed to the southeast of MW-2 <br /> The data collected during this scope of work will be used to define the migration of the <br /> L groundwater plume, to complete a feasibility study, and to make recommendations <br /> regarding future work at this site. The feasibility study will evaluate the following <br /> remediation options: <br /> • Natural biological attenuation <br /> • Enhanced biological attenuation using Oxygen Release Compound <br /> • Groundwater pump and treat <br /> L <br /> 3.1 Drilling <br /> LPermits will be obtained, as necessary, for the borings and monitoring well before drilling <br /> begins. The single soil boring (not to be completed as a monitoring well) will be completed <br /> using the cone penetrometry test method to obtain relevant lithological and hydrological <br /> data. The remaining four (4) soil borings/monitoring wells will be accomplished using a <br /> mobile mounted drilling rig employing the use of a hollow stem flight auger no less than 3 <br /> 1/4-inch i.d. and 8-inch o.d. <br /> All drilling equipment will be thoroughly cleaned before drilling begins, to prevent the <br /> introduction of contamination from off site, and between borings to prevent cross <br /> contamination. <br /> L <br />