My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011690
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
501
>
2900 - Site Mitigation Program
>
PR0508007
>
ARCHIVED REPORTS_XR0011690
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:56:27 PM
Creation date
2/6/2020 3:27:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011690
RECORD_ID
PR0508007
PE
2950
FACILITY_ID
FA0007880
FACILITY_NAME
ARCO FACILITY #434
STREET_NUMBER
501
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03119028
CURRENT_STATUS
02
SITE_LOCATION
501 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Date April 27,2001 <br /> Quarter 1 Q0 l <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 434 Address 501 West Kettleman Lane, Lodi,CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person SECOR International Incorporated/Rusty Benkosky <br /> Consultant Project No 077 43125 701 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Services <br /> Assembly Bill 681 Status Property is owned by Atlantic Richfield Company(ARCO) <br /> WORK PERFORMED THIS QUARTER (First Quarter-2001): <br /> 1 Conducted groundwater monitoring and sampling j <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (Second Quarter—2001): <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY <br /> Current Phase of Project Momtoring/Intenm remediation <br /> Frequency of Groundwater Sampling Wells W-1A,W-2B,W-2,W-3,W-9,and W-2A sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly _. <br /> Is Free Product(FP)Present On-Site No <br /> FP Recovered this Quarter NA <br /> Cumulative FP Recovered to Date NA <br /> Current Remediation Techniques Natural Attenuation <br /> Approximate Depth to Groundwater 54'2 to 56%feet <br /> Groundwater Gradient Southeast CC 0 001 fdit <br /> DISCUSSION: <br /> TPHg was reported in two of six wells sampled this quarter at concentrations of 108 ppb(W-IA)and 718 ppb <br /> (W-2A) Benzene was reported in three of the six wells at concentrations of 0 515 ppb(W-2B),0 790 ppb(W-2), <br /> and 9 25 ppb(W-IA) MtBE was not reported in any of the six wells sampled this quarter Oil and Grease was not <br /> detected in well W-9 Groundwater elevations across the site increased by an average of 176 feet this quarter <br /> Groundwater flow direction was to the southeast at 0 001 ft/ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.