Laserfiche WebLink
0 lot - <br /> GROUNWA,rER <br /> MONITORING FIELD FORM <br /> ' .� �Rfir�m�le <br /> PROJECT#: � •���t WELL ID: �zCONDOR -ae- <br /> PROJECT ID: vTT-M#Ljj-qCa DATE: 188 Frank West Cirde, Suite 1, Stockton, CA 95206 <br /> PERSONNEL: Ck,.j&%L+ J3,.0 CONDITIONS: r—Atrt (209)234-0518 <br /> DECONTAMINATION METHOD: Standard Procedure/Alcohol/Other(specify): - - <br /> (standard decontamination procedure consists of washing gear with a solution of DI water and a phosphate free soap and then double rinsing with Dl water) <br /> PRE-PURGE DATA: ' PURGE VOLUME PROTOCOL(#of casing volumes) 1 4 5 WELL CASING DIAMETER(in.) �.. <br /> WELL CASING DEPTH:_l $2 (measured detail MEASURING POINT:MOC/NORTH SIDE CASING <br /> DEPTH TO WATER:-_ 22.$g DEPTH TO ODUCT: PRODUCT LAYER: multipliers:0.75"=.0229, 2"=.163,4"=.653, 6"= 1.02 <br /> WATER COLUMN: MULTIPLIER: =X J!{�� G+ .15 t _ *VOLUME PROTOCOL: Q. sf <br /> 80%RECOVERY: *0.8=�Z.3.0 0 =1 casing volume total volume to be purged <br /> PURGE DATE: PURGE DEVICE: 1XSR BA1t_KW. If pumped, specify: discharge rate( m) depth pump set(ft.) --� <br /> FIELD INSPECTION SAMPLE: C1—C4AL oo_Moderate-Poor FMS heen—Layer _ one Sli 11t-Moderate-Strop <br /> color clarity sheen or product phase thickness Describe <br /> TIME L hourl VOL.PURGED TEMP (F 1 C) OR EC D_ O(mglL) MV rel. TDS(g/L) _TURB. (NTD <br /> l z?p 0 GALLLONS 2.%-(.S 64 <br /> _J 1:z`[ __ , (O 7- 4. 9 T. 29 l061 <br /> Total Vol.Purged s Q if well purges dry:TIME VOLUME PURGED DTW <br /> SAMPLING DATA: DTW AT TIME OF SAMPLING <br /> SAMPLE ID:'��1 - WL - 15 - (9- 5S TIME: ]rZ '.33 COLLECTION DEVICE: S� 3p1LE� <br /> ANALYSIS REQUESTED: MT L <br /> CONTAINERS USED(LIST#,TYPE,PRESERVITAVE): q V� � <br /> QAIQC SAMPLES: DUPLICATE SAMPLES:YES SAMPLE ID: TIME <br /> RINSATE SAMPLES: YES/ O SAMPLE ID: TIME <br /> FIELD NOTES: <br /> 0AFormsTield FormslgwmKiWMFF2.doc <br />