Laserfiche WebLink
First Quarter 2005 Groundwater Momtoting Report <br /> Boyett Petroleum,419 S.Main,Manteca,CA <br /> Page 3 <br /> • Table 2: Labor tory Anal tical Results (March 22 and 23, 2005) <br /> Other <br /> B T E X TPH-G MTBE Oxygenates/ <br /> Additives <br /> Detection 0.5 0.5 0.5 1.0 0.05 0.5 0.5-5,0 <br /> Limits: ltg/L pg/L pg/L µg/L mg/L pg/L pg/L <br /> Analytical Method: 8260E 8260B 8260B 8260B 8015M 8260B 8260B <br /> Sample I.D. Well I.D. <br /> 3761-MW2-3/23/05 MW-2 <0.5 <0.5 <0.5 <1.0 <0.05 <0.5 <0.5-5.0 <br /> 3761-MW3-3123/05 MW-3 <0.5 <0.5 <0.5 <L0 <0.05 <0.5 <0.5-5.0 <br /> 3761-MW4R-3/23105 MW-4R <0.5 <0.5 <0.5 <L0 <0.05 3.0 <0.5-5.0 <br /> 3761-MW6-3123/05 MW-6 <0.5 <0.5 <0.5 I <1.0 <0.05 <0.5 <0.5-5.0 <br /> 3761-MW7-3/22/05 MW-7 <0.5 <0.5 <0.5 1 <1.0 <0.05 420 <0.5-5.0 <br /> 3761-MWS-3/22/05 MW-8 <0,5 <0.5 <0.5 <1.0 <0.05 <0.5 <0.5-5.0 <br /> 3761-MW9-3/23105 MW-9 <0.5 <0.5 <0.5 <1 A <0.05 <0.5 <0.5-5.0 <br /> 3761-MW10-3/23/05 MW-10 <0.5 <0.5 <0.5 <1.0 <0.05 110 <0.5-5.0 <br /> 3761-MW 11-3123/05 MW-1 1 <0.5 <0.5 <0.5 <1.0 <0.05 1 28 <0.5-5.0 <br /> 3761-EW1-3/22/05 EW-1 <0.5 1 <0.5 <0.5 1 <L0 <0.05 150 <0.5-5.0 <br /> • Unit Conversions: Analytical <br /> pg/L:parts per billion(ppb). BTEX=benzene,toluene,ethyl benzene,and total xylenes. <br /> rng/L:parts per million(ppm). TPH-G=total petroleum hydrocarbons,quantified as gasoline. <br /> MTBE=methyl tertiary-butyl ether. <br /> Other oxygenates/additives=ethanol(EtOH),tertiary-butanol(TBA),di-isopropyl ether(DIPS), <br /> ethyl tertiary-butyl ether(ETRE), tertiary-amyl methyl ether(TAME), 1,2-dichloroethane (1,2- <br /> DCA),and 1,2-dibromoethauc(EDB). <br /> Laboratory analytical results indicate that BTEX constituents, gasoline oxygenates/additives other than <br /> MTBE, and TPH-G were not detected at or above the laboratory reported detection limits in the <br /> groundwater samples collected from the monitoring wells. MTBE was detected in the groundwater <br /> samples collected from MW-4R, MW-7, MW-10, MW-11, and EW-1. MTBE was not detected at or <br /> above the laboratory reported detection limit of 0.5 µg/L in the groundwater samples collected from MW- <br /> 2, MW-3, MW-6, MW-8, and MW-9. <br /> DISCUSSION AND RECOMMENDATIONS <br /> From November 18 through 21, 2003, Condor conducted a 72-hour constant rate pump test at monitoring <br /> well MW-11 to evaluate the potential for using groundwater pump and treat methods for interim <br /> remediation of groundwater impacted by MTBE at the Site. In the Additional Groundwater Investigation, <br /> Monitor Well Destruction and Installation, and Interim Remediation Pump Test Report, dated January 30, <br /> 2004, Condor recommended the installation and operation of a groundwater pump and treat system using <br /> MW-11 as a groundwater extraction well for interim remediation of contaminated groundwater at the <br /> Site. Regulatory agencies have not approved the use of groundwater pump and 'treat for interim <br /> remediation at the Site as of the date of this report. <br /> • <br /> '1 <br /> �J CONDOR <br />