Laserfiche WebLink
Please include a copy of any studies ( soils , geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. SOIL BORINGS WILL BE AVAILABLE IN THE NEAR FUTURE. <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a. Water Supply: ON-SITE WELL <br /> b. Sewage Disposal: NEW SEPTIC SYSTEM <br /> C . Storm Drainage: - <br /> SlTE RETENTION BASIN <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension( s ) : <br /> d. Natural Gas : NONE NEEDED <br /> e. Electricity: PROVIDED FROM PACIFIC GAS AND ELECTRIC COMPANY <br /> f . Road/Access ( i .e. , paved, unpaved, public/private, road name ) : <br /> SCHULTE ROAD - EXISTING ACCESS FUTURE ACCESS FROM SCHULTE ALONG WEST P RTION 0: <br /> g . Fire: - Distance to nearest fire station: PROPER- <br /> h. Schools: N/A <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> APPROXIMATELY 150,000 C.Y. OF GRADING WILL BE DONE. FILL NEEDED FOR THE <br /> BUILDING WILL BE EXCAVATED FROM THE NORTH END OF THE SITE APPROXIMATELY <br /> 70,000 C.Y. THE ONLY VEGETATION THAT WILL BE AFFECTED WILL BE THE ALFALFA <br /> N ALF OF THE PROPERTY. THE EXCAVATION REQoUIRED FOR THE NEW BUILDIN <br /> 3 . Air Quality Information•WILL CREATE A SECOND BORROW AREA 0"; THE NORTH SIDE OF SIT <br /> Number and type of vehicles associated with completed project <br /> NO MORE THAN EXISTING. <br /> Types of emissions and sources associated with project <br /> NONE <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project NO ADDITIONAL AMOUNTS <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> FIVE ACRES <br /> Irrigated X Not irrigated <br /> Site Approval Application <br /> - 7 - ( 6/86 ) <br />