Laserfiche WebLink
TRACY CONSTRUCTORS, A JOINT VENTURE <br /> January 24, 1989 <br /> R E C E 1 <br /> Mr. B.J. Lacey <br /> Rust International JAN 2 •: H-3 <br /> Meadowbrook Corporate Park <br /> 100 Corporate Parkway <br /> P.O. Box 101 <br /> Birmingham, Alabama 35201-0101 <br /> SUBJECT: Tracy Biomass Power Project <br /> Sanitary Leach Field Design <br /> Dear Mr. Lacey: <br /> The following is in response to your letter of January 16, 1989 regarding Sanitary Leach Field <br /> Design. The total plant staff is 25 as indicated in the BOD; however, only 16 will be daily plant <br /> staff. Administration and office staff will be 5. The general plant staff will be 11 with 2 of them <br /> in the fuel yard. In addition, the 12 truck drivers and 10 visitors agree with our estimate of peaks. <br /> The flow of waste to the leach fields will be based on the following: <br /> o Yard Service Building <br /> - Truck Drivers 12 * 15 gal/day = 180 gal II 25 -1 -'75ep <br /> Fuel Yard Staff 2 * 0.5 * 15 gal/day = _L5 gal 1125 4 <br /> o O&M Building 195 gal <br /> - Admin. & Office <br /> Staff 5 * 30 gal/day = 150 gal <br /> - Fuel Yard Staff 2 * 0.5 * 15 gal/day = 15 gal <br /> - Other Gen. Staff 9 * 15 gal/day = 135 gal <br /> - Visitors 10 * 15 gal/day = 150 gal <br /> 490 gal �135� -75 /9 9? <br /> Based on this, the leach field as calculated by J. Pigg should remain as designed. 30 <br /> Regards, <br /> ` <br /> TRACY CONSTRUCTORS <br /> T.A. Brummer <br /> Project Engineer <br /> TAB/clk <br /> cc: K. Lambert <br /> C. Librizzi <br /> File <br /> P.O. Box 1297 Telephone: 205 985-5200 <br /> Birmingham, AL 35201-1297 Telecopy: 205 985-5231 <br />