My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081577 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10500
>
2600 - Land Use Program
>
SR0081577 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 9:33:10 AM
Creation date
2/7/2020 11:44:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081577
PE
2602
FACILITY_NAME
ROBERTSON'S READY MIX
STREET_NUMBER
10500
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19327019
ENTERED_DATE
12/30/2019 12:00:00 AM
SITE_LOCATION
10500 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IV. O.W.T.S. OPERATIONAL PARAMETERS AND COMPONENTS <br /> A. PROPOSED SEPTIC SYSTEM OPERATION <br /> SSS§ 3.7. The design of this conventional leachline disposal system is based upon the factors for <br /> efficient operation, disposal field longevity, and environmental protection. An overview of the <br /> system operation to serve the existing facility is as follows: <br /> Influent from the modular restroom will gravity flow to a 2,000 gallon standard precast concrete <br /> septic tank. Effluent from the second compartment of the tank will gravity to a distribution box (D- <br /> box) where effluent will be equally distributed between three 4" perforated drain pipe. The pipe is to <br /> be laid level with capped ends to promote equal distribution over the soil-effluent interface. A <br /> minimum of 18" of drain rock is to be placed under the drain pipe and 2" of rock above the pipe. <br /> Filter fabric is to be installed over the drain rock and backfilled to final grade with onsite native soil. <br /> The leachfield is to be constructed in the southeast corner of the property, as noted on the OWTS <br /> Site Plans found in Appendix B. <br /> The 100%reserve replacement area is denoted on the Site Plans and is directly adjacent to the north <br /> of the primary leachfield. <br /> B. SEPTIC TANK <br /> Septic tanks store accumulated sludge, scum and effluent(clear zone) volumes, which in turn <br /> affect treatment of nitrogen within the tanks. The calculations below demonstrate that the tank <br /> can easily maintain ample hydraulic residence time (HRT)of the influent for advanced treatment, <br /> particularly nitrogen: <br /> Detention/Hydraulic Residence Time Calculation: <br /> HRT Time=2000 gal tank capacity x 0.70(30%volume lost to sludge/scum accumulation) <br /> 1.5 (Peaking Factor)x 92 gals/day(ADF) <br /> Detention Time= 10 days. The minimum acceptable detention time is 1.0 day. <br /> C. LEACHLINE SIZING CALCULATIONS <br /> Base Tank Capacity(BTC)= 1,200 gal. Leachline Equivalent Requirement= <br /> 1,200 gallons BTC +92 ADF x 0.200 Soil Factor(SF)=258 lineal feet of leachline (LFLL) <br /> required. Install - 85 ft LL: 3 LL x 85 ft Long=255 LFLL <br /> Page -8- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.