(-TV. 0.W.T.S. OPERATIONAL PARAMETERS AND COMPONENTS <br />A. PROPOSED SEPTIC SYSTEM OPERATION <br />SSS§ 3.7. The design of this conventional leachline disposal system is based upon the factors for <br />efficient operation, disposal field longevity, and environmental protection. An overview of the <br />system operation to serve the existing facility is as follows: <br />Influent from the modular restroom will gravity flow to a 2,000 gallon standard precast concrete <br />septic tank. Effluent from the second compartment of the tank will gravity to a distribution box (D- <br />box) where effluent will be equally distributed between three 4" perforated drain pipe. The pipe is to <br />be laid level with capped ends to promote equal distribution over the soil-effluent interface. A <br />minimum of 18" of drain rock is to be placed under the drain pipe and 2" of rock above the pipe. <br />Filter fabric is to be installed over the drain rock and backfilled to final grade with onsite native soil. <br />The leachfield is to be constructed in the southeast corner of the property, as noted on the OWTS <br />Site Plans found in Appendix B. <br />The 100% reserve replacement area is denoted on the Site Plans and is directly adjacent to the north <br />of the primary leachfield. <br />SEPTIC TANK <br />Septic tanks store accumulated sludge, scum and effluent (clear zone) volumes, which in turn <br />affect treatment of nitrogen within the tanks. The calculations below demonstrate that the tank <br />can easily maintain ample hydraulic residence time (HRT) of the influent for advanced treatment, <br />particularly nitrogen: <br />Detention/Hydraulic Residence Time Calculation: <br />HRT Time = 2000 gal tank capacity x 0.70 (30% volume lost to sludge/scum accumulation) <br />1.5 (Peaking Factor) x 92 gals/day (ADF) <br />Detention Time = 10 days. The minimum acceptable detention time is 1.0 day. <br />LEACHLINE SIZING CALCULATIONS <br />Base Tank Capacity (BTC) = 1,200 gal. Leachline Equivalent Requirement = <br />1,200 gallons BTC + 92 ADF x 0.200 Soil Factor (SF) = 258 lineal feet of leachline (LFLL) <br />required. Install 3 - 85 ft LL: 3 LL x 85 ft Long = 255 LFLL <br />Page -8- <br />Chesney Consulting