My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2900 - Site Mitigation Program
>
PR0508442
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 8:38:16 AM
Creation date
2/10/2020 8:30:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0508442
PE
2950
FACILITY_ID
FA0008078
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710003
CURRENT_STATUS
01
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE HEALTH AND SAFETY PLAN <br /> Site Assessment <br /> CHP Stockton <br /> 3330 North Ad Art Road <br /> Stockton, CA <br /> 1.0 PLAN SUMMARY <br /> This Site Health and Safety Plan (SHSP) establishes responsibilities, requirements, and procedures for the protection of <br /> personnel while performing activities at the above-referenced site. This site-specific plan conforms with the Alton <br /> Geoscience Corporate Health and Safety Plan, Hazard Communication Program, and Injury and Illness Prevention <br /> Program(IIPP). <br /> During site work, the use of proper health and safety procedures, in accordance with applicable Cal/OSHA regulations <br /> shall be required. Site-specific conditions may necessitate modification of the SHSP; however, except in emergency <br /> situations no deviations from the plan may be implemented without the prior notification and approval of the Site Safety <br /> Officer(SSO). <br /> 2.0 SITE INFORMATION <br /> This SHSP considers the physical, chemical, and environmental hazards that may be encountered during work activities <br /> at the site. Operations associated with this SHSP will be conducted in accordance with an approved workplan. Any <br /> changes required or made to the planned activities will be immediately communicated to site personnel by the SSO. <br /> Summary information for this project is provided in the following table. <br /> Workplan date February 19, 1999 <br /> Principal activities: Geoprobe borings <br /> Site description CHP Facility <br /> (see Attachment A for site map): <br /> Approximate depth to groundwater: unkown <br /> Contaminants of concern Gasoline <br /> (see Attachment B): <br /> p:\projects\CIIP\Williams <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.