Laserfiche WebLink
MRP-17-1999 1354 RLTOH GECISCIEId E 925 GOO 925@ P.04/10 <br /> Subsurface InveAigation Workplan <br /> CHP Facility, 3330 North Ad Art Road, Stockton <br /> February 19 1999 <br /> 5 oxygenates using EPA Method 8260. <br /> All laboratory analyses will be performed by a state-certified laboratory. Chain of Custody <br /> protocol will be followed for all samples selected for analysis, thus providing a continuous record <br /> of sample possession prior to actual analysis. <br /> 3.3 SUBSURFACE INVESTIGATION REPORT <br /> A report will be submitted on the subsurface investigation results and will include boring logs, <br /> laboratory analysis results, findings, and conclusions. <br /> 4.0 WORK SCHEDULE <br /> Planned activities will be performed according to the following estimated completion schedule: <br /> • Drill borings approximately two weeks after workplan approval. <br /> • Submit subsurface investigation report approximately five weeks after completion of field <br /> activities. <br /> 5.0 LIST OF ATTACB3CENTS <br /> • Figure 1: Site Vicinity Map <br /> • Figure 2: Site Plan <br /> • Appendix A: General Field Procedures <br />