My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2900 - Site Mitigation Program
>
PR0508442
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 8:38:16 AM
Creation date
2/10/2020 8:30:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0508442
PE
2950
FACILITY_ID
FA0008078
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710003
CURRENT_STATUS
01
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MRP-17-1999 1354 RLTOH GECISCIEId E 925 GOO 925@ P.04/10 <br /> Subsurface InveAigation Workplan <br /> CHP Facility, 3330 North Ad Art Road, Stockton <br /> February 19 1999 <br /> 5 oxygenates using EPA Method 8260. <br /> All laboratory analyses will be performed by a state-certified laboratory. Chain of Custody <br /> protocol will be followed for all samples selected for analysis, thus providing a continuous record <br /> of sample possession prior to actual analysis. <br /> 3.3 SUBSURFACE INVESTIGATION REPORT <br /> A report will be submitted on the subsurface investigation results and will include boring logs, <br /> laboratory analysis results, findings, and conclusions. <br /> 4.0 WORK SCHEDULE <br /> Planned activities will be performed according to the following estimated completion schedule: <br /> • Drill borings approximately two weeks after workplan approval. <br /> • Submit subsurface investigation report approximately five weeks after completion of field <br /> activities. <br /> 5.0 LIST OF ATTACB3CENTS <br /> • Figure 1: Site Vicinity Map <br /> • Figure 2: Site Plan <br /> • Appendix A: General Field Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.