My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
14253
>
2900 - Site Mitigation Program
>
PR0543397
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 11:21:23 AM
Creation date
2/10/2020 9:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543397
PE
2965
FACILITY_ID
FA0012215
FACILITY_NAME
RCCI PTP
STREET_NUMBER
14253
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
19803031
CURRENT_STATUS
01
SITE_LOCATION
14253 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(ii) Operation of the injection facility is temporarily granted for the two <br /> (2) weeks following initial operations to allow for sample analyses to <br /> be performed and for the results to be submitted to EPA. <br /> (iii) The Permittee shall maintain copies (or originals) of all records <br /> relating to the hazardous waste determination and make such records <br /> available for inspection. <br /> (iv) The Permittee shall perform an additional hazardous waste <br /> determination whenever there is a process change or a change in fluid <br /> chemical constituents or characteristics. <br /> 2. Mechanical Integrity <br /> (a) Mechanical Integrity Tests "MITs") <br /> (i) Casing/tubing annular pressure internal MIT) <br /> A demonstration of the absence of significant leaks in the casing, <br /> tubing and/or liner hanger shall be made by performing a pressure test <br /> on the annular space between the tubing and long string casing. This <br /> test shall be for a minimum of thirty (30) minutes at a pressure equal <br /> to or greater than the maximum allowable injection pressure. A well <br /> passes the MIT if there is less than a five (5) percent change in <br /> pressure over the thirty (30) minute period. A pressure differential of <br /> at least 350 pounds per square inch ("psi") between the tubing and <br /> annular pressures shall be maintained throughout the MIT. <br /> (ii) Continuous pressure monitoring <br /> The tubing/casing annulus pressure and injection pressure shall be <br /> monitored and recorded continuously to an accuracy within one (1) <br /> psi. The average, maximum, and minimum monthly results shall be <br /> included in the quarterly report to EPA unless more detailed records <br /> are requested by EPA. <br /> (iii) Injection profile survey (external MIT) <br /> In conjunction with the initial FOT required in Section A paragraph <br /> 5(c), a demonstration that the injectate is confined to the proper zone <br /> shall be conducted and presented by the Permittee and subsequently <br /> approved by EPA. This demonstration shall consist of a radioactive <br /> UIC Pen-nit CA10500002 <br /> Page 13 of 29 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.