My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
14253
>
2900 - Site Mitigation Program
>
PR0543397
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 11:21:23 AM
Creation date
2/10/2020 9:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0543397
PE
2965
FACILITY_ID
FA0012215
FACILITY_NAME
RCCI PTP
STREET_NUMBER
14253
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95336
APN
19803031
CURRENT_STATUS
01
SITE_LOCATION
14253 S AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> PART I. AUTHORIZATION TO INJECT....................................................................................4 <br /> PART II. SPECIFIC PERMIT CONDITIONS ...............................................................................5 <br /> A. WELL CONSTRUCTION...............................................................................................5 <br /> 1. Requirement for Prior Written Permission to Drill, Test, Construct, or Operate................5 <br /> 2: Locations of Injection Wells CSC-1 and CSC-2.................................................................5 <br /> 3. Order of Construction for Wells CSC-1 and CSC-2............................................................6 <br /> 4. Testing during Drilling and Construction............................................................................6 <br /> 5. Injection Formation Testing.................................................................................................6 <br /> 6. Drilling, Work-over, and Plugging Procedures ...................................................................8 <br /> 7. Casing and Cementing.........................................................................................................8 <br /> 8. Tubing and Liner Hanger Specifications.............................................................................9 <br /> 9. Injection Intervals................................................................................................................9 <br /> 10. Confining Layer................................. <br /> 11. Monitoring Devices .......................................................................................................10 <br /> 12. Final Well Construction Report and Completion of Construction Notice.....................10 <br /> 13. Proposed Changes and Workovers................................................................................11 <br /> B. CORRECTIVE ACTION..............................................................................................11 <br /> 1. Initial ZEI re-evaluation with Field Data...........................................................................11 <br /> 2. Annual ZEI Review...........................................................................................................11 <br /> 3. Implementation of Corrective Actions...............................................................................12 <br /> C. WELL OPERATION.....................................................................................................12 <br /> 1. Demonstrations Required Prior to Injection......................................................................12 <br /> 2. Mechanical Integrity..........................................................................................................13 <br /> 3. Injection Pressure Limitation.............................................................................................15 <br /> 4. Injection Volume (Rate) Limitation...................................................................................15 <br /> 5. Injection Fluid Limitation..................................................................................................16 <br /> D. MONITORING, RECORDKEEPING, AND REPORTING OF RESULTS................16 <br /> 1. Injection Well Monitoring Program...................................................................................16 <br /> 2. Monitoring Information..................................................................................................... 17 <br /> 3. Monitoring Devices ...........................................................................................................18 <br /> 4. Recordkeeping ...................................................................................................................18 <br /> 5. Reporting............................................................................................................................19 <br /> E. PLUGGING AND ABANDONMENT.........................................................................21 <br /> 1. Notice of Plugging and Abandonment...............................................................................21 <br /> 2. Plugging and Abandonment Plans.....................................................................................21 <br /> 3. Cessation of Injection Activities........................................................................................21 <br /> 4. Plugging and Abandonment Report...................................................................................21 <br /> F. FINANCIAL RESPONSIBILITY.................................................................................22 <br /> 1. Demonstration of Financial Responsibility .......................................................................22 <br /> 2. Insolvency of Financial Institution....................................................................................22 <br /> 3. Insolvency of Owner or Operator......................................................................................22 <br /> G. DURATION OF PERMIT.............................................................................................23 <br /> UIC Permit CA10500002 <br /> Page 2 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.