Laserfiche WebLink
Page <br />encountered at approximately <br />go will be_ad•Panced <br />L.J.,T3nitoritig wells <br />kCpitoring casing, <br />Vsloted, ,(slot :size <br />rforated interval' <br />01144.09t141-af7 <br />91e'J'ePlainfrig;' <br />I. eCk,ith'''cement <br />r'in each surface seal , <br />he ,thonitrig.4elr.will be 'developed and sampled u a down- <br />holepositi. eiBplcement bladder pump oria hand-hebottom''; <br />cheok-valve,aL).erAt least five well volumes will' removed' <br />I ro c;feach We, Dpr.ior to samrillng. All ground water .6 'ned ' <br />during devel4meht Will be contained and "sealed in 56t drums <br />and ,will remain on site until the analytical results ai*,received. <br />A shallow ground water sample will be obtainedfrom eac'yell and <br />transported to a ,State-certified ,lat.oratory in a refit4':2 ted <br />container under ikPrroPriats chain of —gtc,dy document 'tr ItY • <br />Selected soil and ground wa <br />or all of, the following: <br />.organic and arpmaticcohatituents <br />Methods 624 for water and 8240 for soil' <br />semi-volatile organics USing EPA Test Metodi 625 for water <br />and 8270 for; soil <br />organochlorine pesticides using EPA Test Methods 608 for <br />water and 8080. for soil <br />California Assessment Mahual (CAM) metals <br />total petroleum hydrocarbons <br />VU15, 4 ID e)c-I? ' <br />We hope this information is adequate for the permit application <br />process. If you have any questions or require additional, <br />information, please Call. We would like to perform the field work <br />on November 28, 1988 ,and would- greatly appreciate any help you can <br />give us in meeting our schedule. If required,lwe are willing to <br />pay $52.50 per hour„t overtime for processing the permit application <br />so drilling may proceed as scheduled. <br />cheC104for the amount of $ 1-