Laserfiche WebLink
dt <br /> Waste analyses and 1 tests are csnduc-ed vhenever a <br /> . trial <br /> different treatme: t process ' s _ <br /> i, treated or stored in a taal:. <br /> e . The following equipment is inspected daily: <br /> (1) Discharge and ove r f i 1' n <br /> control equipment; <br /> (2) Data from monitor"-g ecu-p,- <br /> _e,t ib''"b'-S + a*`. ) ; and <br /> (3) Level of waste in tank. <br /> f. The following equipment is inspected weekly: <br /> (1) Tank construction materials; and <br /> (2) Discharge eonfstructures . <br /> g. Ignitable or reactive waste is not .!aced in tank unless <br /> the waste is rendered unreact.ve be--`ore or ir4. ed:ately <br /> a=ter placement in the tank, the wast' is protected from <br /> sources of reaction, cr the tank is used for emergency <br /> only. . <br /> h. Describe procedures for hardling the following wastes , <br /> including use of buf'er zones (covered,tanks c with nt i n <br /> ignitable or reacn <br /> tive waste comp_y <br /> Fire Protection Association butter zone requirements for <br /> tanks , shown in Tables 2-1 through 2-6 of the "Flammable <br /> and Combustible Code published annua'-ly) : <br /> (1) Incompatible wastes . <br /> (2) Ignitable castes. <br /> (3) Reactive wastes - <br /> i . Incompatible wastes are not placed in same tank unless <br /> uncontrolled reactions are prevented. <br /> j . Tanks holding PCBs are managed in accordance with Part <br /> 761 , Title 40, <br /> Corte of Federal Regulations . <br /> D. Facility inspection. <br /> 1 . Describe the general inspection checklist and schedule <br /> incluc �g (=.e. , include a copy) : <br /> a . Equipment to be inspected: <br /> I .A. l .b -6�- <br />