My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
18500
>
2900 - Site Mitigation Program
>
PR0541975
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 10:40:24 AM
Creation date
2/10/2020 10:00:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541975
PE
2953
FACILITY_ID
FA0024089
FACILITY_NAME
SRI INTERNATIONAL
STREET_NUMBER
18500
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
18500 W CORRAL HOLLOW RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dscribe the records kept at the fac. l. of training g. ;e^ , <br /> 1 p <br /> J including the following: <br /> a . :or each position related to hanarGGUs paste c,ar.ag_^ent: <br /> (1) Job title; <br /> (2) Have of employee fillirg job; zr,d <br /> (3) Written job description including: <br /> (a) Required qualifications (e. g. , skill , education, <br /> etc. ) . <br /> (b) Duties assigned. <br /> b. Records documenting that training has been given to, and <br /> cc,oleted by, facility perscnnel. <br /> 6. Identify* the length of time that training records are I:ept, <br /> including: <br /> a. Records on current personnel (retain until facility <br /> cicses) . <br /> b. Records on former personnel (retain three years) . <br /> B. Describe the employees required to operate the facility, including: <br /> 1 , 2:u_:.�er of employees . <br /> 2. Deployment. <br /> X. Emergency Procedures <br /> A. Describe the contingency plan (i.e. , include a copy) . <br /> 1. Content of the plan must include: <br /> a. Description of actions to be taken by facility personnel <br /> in response to: <br /> (1) Fires . <br /> (2) Explosions . <br /> (3) Any unplanned sudden or nonsudden release of waste <br /> or constituents to: <br /> (a) Air. <br /> I .A. l .b -68- <br />
The URL can be used to link to this page
Your browser does not support the video tag.