Laserfiche WebLink
Work Order -Actual Detail Listing <br /> Page 1 of 1 Date: 4/23/2014 14:59:06 <br /> Plan Work Work <br /> Work Order Originator Status Priority Asset No Type Area <br /> C310127 mdesantiago CLO 5 STAGG-HIS-SITE SCHED S1 <br /> Planner: LOPE-002 Due Date: 12/27/2011 Status Change Time: 14:14 Cause Code: <br /> Approver: LEUB-001 Completion Date: 11/16/2011 Safety? N Action Code: <br /> Work Location: STAGG <br /> Work Requested: the site need two barrels for throw away lightssee martin Corrective Action: w/o completed.2 barrels delivered. <br /> Employee Activity <br /> Craft <br /> Report Date Name Activity Code Code Hours Rate Actual Cost <br /> 09/16/2011 ALBERTO VILLALOBOS MAN MC 1.50 28.3 $42.45 <br /> 09/16/2011 BEE VANG MAN MC 1.50 28.24 $42.36 <br /> Total Hours: 3.00 Total Costs: $84.81 <br /> 2 Employee(s)listed. <br /> ACTUAL EXPENDITURES <br /> LABOR $84.81 <br /> CONTRACT $0.00 <br /> MATERIAL $0.00 <br /> GRAND TOTAL: $84.81 <br /> =Z <br /> M <br /> n00 <br /> -0 z <br /> M <br />