Laserfiche WebLink
Work Order - Actual Detail Listing <br /> Page 1 of 1 Date: 4/23/2014 15:03:23 <br /> Plan Work Work <br /> Work Order Originator Status Priority Asset No Type Area <br /> C333155 fbaird CNX 5 STAGG-HIS-SITE SCHED S1 <br /> Planner: SMIT-004 Due Date: 07/24/2013 Status Change Time: 14:02 Cause Code: <br /> Approver: LEUB-001 Completion Date: 06/14/2013 Safety? N Action Code: <br /> Work Location: STAGG <br /> Work Requested: pick up two barrels of spent light tubes and a box of 8ft spent light tubes. This is ready for Corrective Action: CANCELLED <br /> pickup <br /> ACTUAL EXPENDITURES <br /> LABOR $0.00 <br /> CONTRACT $0.00 <br /> MATERIAL $0.00 <br /> GRAND TOTAL: $0.00 <br /> n <br /> 0 <br /> ;A, o <br /> �a i77 <br />