Laserfiche WebLink
Work Order - Actual Detail Listing <br /> Page 1 of 1 Date: 4/23/2014 14:59:53 <br /> Plan Work Work <br /> Work Order Originator Status Priority Asset No Type Area <br /> C315038 mdesantiago CLO 5 STAGG-HIS-SITE SCHED S1 <br /> Planner: SMIT-004 Due Date: 05/02/2012 Status Change Time: 13:24 Cause Code: <br /> Approver: LEUB-001 Completion Date: 05/31/2012 Safety? N Action Code: <br /> Work Location: STAGG <br /> Work Requested: the site needs the 2 barrels of bad lights pickup.the items above is in the cusodial garage. Corrective Action: PROVIDE 2 BARREL FOR LIGHTS TO <br /> CUSTODIAN <br /> Employee Activity <br /> Craft <br /> Report Date Name Activity Code Code Hours Rate Actual Cost <br /> 01/11/2012 BEE VANG MAN MC 1.50 28.24 $42.36 <br /> 1 Employee(s)listed. Total Hours: 1.50 Total Costs: $42.36 <br /> ACTUAL EXPENDITURES <br /> LABOR $42.36 <br /> CONTRACT $0.00 <br /> MATERIAL $0.00 <br /> GRAND TOTAL: $42.36 <br /> �C <br /> n m <br /> �z o C*) <br /> n� M <br /> M <br /> nzz: 1< <br /> n M <br /> - r <br />