Laserfiche WebLink
I . PHASING OF PROJECT <br /> Phase Time Period Activity <br /> AS SOON AS THIS TENTATIVE PARCEL MAP APPLICATION IS APPROVED AND COMPLETED. <br /> SITE CHARACTERISTICS -- EXISTING <br /> A. GENERAL <br /> 1. Size of Project Area 81.12 ACRES <br /> 2 . Average Slope: 0-5$_x (, 6-10% 11-20% more than 20% <br /> 3. Uses (structures, crops , etc. ) APRICOT ORCHARD <br /> 4 . Uses in the Immediate Vicinity <br /> North RESIDENTIAL & ORCHARDS South ORCHARDS AND ROW CROPS <br /> East ORCHARDS West ALMOND ORCHARD <br /> 5 . Property Description (shape, terrain, unique features , etc . ) <br /> THE TERRAIN IS EVENLY GRADED SLOPING TO THE NORTHEAST FOR FLOOD <br /> IRRIGATION. THE PROPERTY IS AN IRREGULAR RECTANGLE <br /> 6 . Specify waterways or irrigation on property or continguous <br /> property <br /> BANTA CARBONA IRRIGATION DISTRICT MAIN CANAL AND MIDDLE MAIN CANAL RUN <br /> ALONG THE SOUTH LINE OF THE SUBJECT PROPERTY. <br /> 7 . Specify any easements or utility rights-of-way <br /> NONE <br /> B. ENVIRONMENT <br /> 1. Vegetation on site (oaks , riparian vegetation, etc . ) <br /> APRICOT ORCHARD <br /> 2 . Rare or endangered animals or plants NONE <br /> 3 . Subject to flooding, poor drainage, or other natural hazard <br /> NO <br /> 4 . Historic or archaeological resources , scenic aspects , or sand <br /> or gravel resources NONE <br /> -5- (9/85 ) <br /> Plan-44 <br />