My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
24333
>
2900 - Site Mitigation Program
>
PR0524348
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:18 PM
Creation date
2/10/2020 11:16:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0524348
PE
2950
FACILITY_ID
FA0016333
FACILITY_NAME
EBMUD
STREET_NUMBER
24333
STREET_NAME
STATE ROUTE 12
City
CLEMENTS
Zip
95227
APN
02321001
CURRENT_STATUS
01
SITE_LOCATION
24333 HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br /> PIEZOMETER ABANDONMENT <br /> EAST BAY MUNICPAL UTILITIES DISTRICT <br /> FOLSOM SOUTH CANAL CONNECTION <br /> SACRAMENTO AND SAN JOAQUIN COUNTIES, CALIFORNIA <br /> File No: 02001 PROP.ENV/ST07P230 <br /> September 11, 2007 <br /> INTRODUCTION <br /> Kleinfelder is pleased to present this proposal for the abandonment of seven piezometers <br /> associated with the East Bay Municipal Utilities District's (EBMUD) Folsom South Canal <br /> Connection in Sacramento and San Joaquin Counties, California. Kleinfelder is <br /> committed to providing quality service to our clients, commensurate with their wants, <br /> needs, and desired level of risk. If a portion of this proposal does not meet the needs of <br /> Balfour Beatty Infrastructure, Inc., or if those needs have changed, Kleinfelder will <br /> consider appropriate modifications, subject to the standards of care to which we adhere <br /> as professionals. Modifications such as changes in scope, methodology, scheduling, and <br /> contract terms and conditions may result in changes to the risks assumed by you our <br /> client, as well as adjustments to our fees. We look forward to the opportunity to serve <br /> you. <br /> BACKGROUND <br /> Mr. Travis Price of Balfour Beatty Infrastructure, Inc., contacted Kleinfelder to provide <br /> this proposal to properly abandon seven piezometers in accordance with Sacramento <br /> and San Joaquin County Well Standards. Three of the piezometers (MP-6, 10, and 11) <br /> are located in Sacramento County at the Clay Station Pumping Plant Site. Four of the <br /> piezometers are located in San Joaquin County, three (LH-3, 6, and 9) of which are <br /> located at the Comanche Site and one (MQ-7A) which is located at the Pipeline No.2 <br /> Flow Splitting Facility Site. The borings for the piezometers range in depth from <br /> approximately 26 to 60 feet below the ground surface (bgs). We understand that the <br /> piezometers were installed as part of a geotechnical investigation of the structural <br /> facilities associated with the Folsom South Canal Connection operated by the EBMUD. <br /> The following table details the construction of the piezometers and is based upon the <br /> Plates, provided by the client and originally included in a Piezometer Installation Report. <br /> According to the piezometer construction plates and information obtained from the <br /> EBMUD Materials Engineering Section, with the exception of MP-11 and a portion of <br /> MP-10, the piezometers were installed in eight-inch diameter borings. Piezometers MP- <br /> 11 and MP-10 (from 35 to 60 feet bgs) were installed in five-inch diameter borings . <br /> 02001 PROP.ENV/ST07P230/FB:ly Page 1 of 5 <br /> ©2007 Kleinfelder September 11, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.