My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 3:31:40 PM
Creation date
2/10/2020 11:37:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MSZ BLM-xx <br /> Page 2 <br /> Step 7: Install The Eccentric Insert&Muni-Sync Feducer <br /> • Dry fit the Eccentric insert.Make sure it fits properly over the pipe&inside the <br /> sleeve. <br /> • Dry fit the Multi-SyncFbducer <br /> • Adjust the positions so that they lineup properly with the Fbpair Seeve&Rpe. <br /> Note: A proper fit will not cause extra pressure or force to the sleeve and will <br /> allow a longer lasting repair. <br /> • Once you have the part lined up correctly <br /> 1. Pull back the Multi-Synclbcluoer&EccentricInsert <br /> 2.Apply Zp-Tite bonder all around the Eccentric Insert, <br /> 3. Side Eccentric into the Fbpair sleeve in the proper position --- <br /> 4. Apply Zip-Tite bonder all around the Multi-Sync fbducer <br /> 5. Side the Multi-Sync Fbducer into-fit proper plat nc ;b tUf In,M there around the ope11 <br /> 6. S?t the Clamp the around the sleeve&over the Eccentric Insert and tighten <br /> It 14 <br /> 7. S?t damp over reducer end on the pipe&tighten enough to create a seal <br /> around the pipe. <br /> RpeSzer 140 Cldf Insert Em[xdridlruat Multi- DBFII FII pan <br /> 50MM Rpe )002.0 MS?BLM-2.0 UIZELM 5.1x20 UIZ6.0x4.5E URZMS4.5.(2.0 1 41 1 32 <br /> 7'RW )0005 MSZBLM-2.4 U1Z9M 5.1x2.4 UIZ6.mx4.5E •AZMS4.5024 39 40 <br /> 63MMRpe X002.5 MSZBLM-2.5 LAZELM 5.102.5 UIZ6.0x4.5E LRLMS4.5x25 38 40 <br /> Z'LG( )QW-7IMSZELM-27 UIZ8LM 5.10Q.7 UIZ6.Ox4.5E I LFCMS4.5,071 37 1 44 <br /> 75Mm Pipe )=.0 MS'_E1M-3.0 UIZBIM 5.106.0 UIZ&W.0 WA 34 48 <br /> 3"R'8&90 MM Rpe )0003.5 MSZELM-3.6 UIZBLM 5.1x3.6 UIZ6.W.6 WA 30 60 <br /> T RRPover7'RV )OM.5x24 MS?8LM-3.6 UI RM 5.106.6 UIZ6.W.6 WA 30 60 <br /> 3"LD( )O003.7 MS?BLM-3.8 UIZB(M 5.U6.8 UIZ6.Ox3.6 WA 28 60 <br /> Qxnupted Ducting over 1 1!7'Rex x00(4.8)20 MSZBLM 4.6x2.0 UIZELM 5.1)2.0 UIZ6.Ox4MS4.5)0_01 33 32 <br /> Corrugated Duclingover 1 1/7'Rex )004.8x25 MSZELM-4.602.5 UIZBLM 5.1x2.5 UIZEN4.5E L1VMS4.5)2.5 31 40 <br /> Sep 9: FII With DE3F Il,Insert Fill Rug TOOLS Fi3DUI R®: <br /> • Assemble DAG&DBFIl(see instructions on DPM website). C3ovesand aaticMixer <br /> • Purge 1-2 oz. 5/16'Nut driver (for Band Camps) <br /> • Fill fitting slowly. DAG Caulk Cin (for DBF 11) <br /> Note: Use P—emote Fill option if access is limited DAGP Caulk Gun (Pneumatic version for DBF II) <br /> • Insert fill plug when filling is completed. <br /> • Clean any spilled DBF II with DBC and dispose p�pD N®®-DBC Cleaner <br /> of remaining products per local requirements. DaEach DBF II&Z Vcome <br /> DBB III Bonder <br /> wit h a Sat is r <br /> Note: After 1 hour DBFII Fblysulfide Liquid Fill <br /> the repair job may ber <br /> hydro-static tested °Y RLLVolume: (per repair hoot) <br /> Volume of DBFII needed = 9,-e Table above <br /> Volume of DBB III needed = 2 oz per part <br /> Femote Fill Option: Parts in kit: <br /> The following parts are available to order if you can not Bonding Feng UIZ MS6.Ctx5.7 CR <br /> properly position the assembled DBF II applicator gun to 9eeve US6.0x6.0 <br /> the repair. The Fbmote Fill parts provide a fle)able Eccentric Insert UIZ6.0x9ae Table <br /> extension for the filling process. Multi-Sync Fbducer UF;ZMS4.5x5be Table <br /> Fes! r XZ'n jjifube with male&female ends 5 damps 3#96,1#80, 1#93e Table <br /> F;FATube-9v Cf-Tubing in_9�xkngths FII Port Rug F;FAxRug <br /> RFAg L's CE-Tubing in-344[4$� length roll Install Instructions <br /> FFAQ L's§Q L's Tube Coupling <br /> FFA st El-Tube-Female FII Fort end <br /> FFAsa%j6 Tube-Male Fill Fort end <br /> FFA§t jk+ CE-Tube-Male Rug for fill port <br />
The URL can be used to link to this page
Your browser does not support the video tag.