My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
504/448
>
2900 - Site Mitigation Program
>
PR0528168
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:04:50 AM
Creation date
2/10/2020 4:03:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0528168
PE
2960
FACILITY_ID
FA0019070
FACILITY_NAME
CITY OF STOCKTON REDEVELOPMENT
STREET_NUMBER
504/448
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13737003 / 02
CURRENT_STATUS
01
SITE_LOCATION
504/448 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br /> .1 • ® Check this box if tank gauging is*only for inventory control. <br /> F. In-Tank Gauging I SIR Equipment: ❑ Check this box if no tank gauging or SIR equipment is instElil9cli _s _ <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: 2016 <br /> 01 r <br /> El Yes Yes ❑ No` Has all input wiring been inspected for proper entry and termination,including testing for ground faults? �U1 <br /> Cl Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue ENTAL <br /> ❑ Yes ❑ Nd Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings testetl? <br /> ❑ Yes ❑ No' Were all probes reinstalled property? <br /> [3 Yes [3 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> r Section H,below,describe how and when these deficiencies were or will be corrected. <br /> ie Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com late the followin checklist: <br /> ® Yes ❑ No' For equipment gstart-up or annual egWpme„ oe❑rtifid zt9 P,hwas a leak simulated to verify LLD pertormance? (Check all that apply) <br /> ❑ NIA Simulated leak rate: ®3 g.p.h.; ❑ 9-P ' <br /> ® Yes ❑ No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus property calibrated? <br /> ® alk? <br /> Yes ❑ No- For mechanical LLDs,does the LLD restrict product How if it detects a le <br /> ❑ N/A <br /> a leak? <br /> T-1Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects <br /> ® N/A <br /> E] Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any potion of the monitoring system is disabled or disconne <br /> ® N/A <br /> ❑ Yes 11LL <br /> No For electronic Ds,does the turbine automefically shut off if any portion of the monitoring system malfunctions or fails a test <br /> ® NIA <br /> ❑ Yes ❑ No' For electronic LLOS,have all accessible wiring connections been visually inspected? <br /> ® NIA <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist cempleted? <br /> In section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 2/21/07 <br /> Monitoring System Certification <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.