Laserfiche WebLink
CAM BRIA <br /> Chemical Analyses: Groundwater and selected soil samples will be analyzed for TPHg, <br /> benzene, toluene, ethylbenzene, xylenes, and MTBE by EPA Method 8260. Groundwater <br /> samples will also be analyzed for methanol, ethanol, tertiary amyl methyl ether, ethyl <br /> tertiary butyl ether, tertiary butyl alcohol, di-isopropyl. ether, 1,2-dichloroethane, and <br /> ethylene dibromide by EPA Method 8260. <br /> Report Preparation: Following the receipt of analytical results from the laboratory, Cambria <br /> will prepare a written report which will include field procedures, laboratory results, boring <br /> logs, conclusions, and recommendations. <br /> SCHEDULE <br /> Cambria is scheduled to drill proposed boring CPT-1 on April 11, 2001 and to drill proposed <br /> borings SB-5 through SB-9 and set the conductor casing for CPT-2 April 11 through 13, <br /> 2001. The water sample is scheduled to be collected from boring CPT-2 on April 16, 2001. <br /> There will be two drilling rigs (one hollow-stem auger and one CPT) onsite for approximately <br /> half the day or. less on April 11, 2001. Cambria will coordinate with the station dealer to <br /> minimize interference to his business during drilling activities. <br /> If you have any questions regarding the scope of work outlined in this work plan, please call <br /> Aubrey Cool at (707) 933-2368. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> i <br /> Aubrey K. Cool <br /> Project Geologist <br /> ;ED GEp <br /> Joe W. Neely, RG <br /> Senior Project Geologist <br /> RG 6927 No.6927 • <br /> 9 OF CAL1C'G <br /> 1346 5 <br />