My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
420
>
3500 - Local Oversight Program
>
PR0545336
>
WORK PLANS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 5:18:19 PM
Creation date
2/10/2020 4:06:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0545336
PE
3528
FACILITY_ID
FA0003776
FACILITY_NAME
KWIK SERV LODI BW 113*
STREET_NUMBER
420
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06202042
CURRENT_STATUS
02
SITE_LOCATION
420 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-29-1999 10:50AM FROM CAMBRIA SONOMA 7079356649 P_6 l <br /> I <br /> envrroso <br /> E <br /> Sample results and a waste profile form will be submitted to Forward Landfill in Stockton, <br /> California. Upon acceptance,the soil will be transported to Forward by Manley and Sons ` <br /> Trucking of Sacramento,California. <br /> Task Z-Rep n Preparation <br /> Following the receipt of chemical analytical data,Enviros will piepare a Tank Removal <br /> Report documenting field activities and presenting chemical analytical results. <br /> Scheduling <br /> Construction activities are scheduled to begin November 18, 1996. The corrective action <br /> phase of this work (tank removal and excavation and disposal of soil) is scheduled to he <br /> completed within the first three weeks of the project(i.e.by December 6, 1996). <br /> Completion of the entire project and re-opening of the station is scheduled to be complete <br /> by December 27, 1996. Weather and unforeseen construction conditions may affect this <br /> schedule. <br /> If you have any questions regarding the contents of this document,please call Diane , <br /> Lundquist at(707) 935-4852. <br /> Sincerely, <br /> I <br /> Enviros.Inc. <br />' oe W. Neely 117 <br /> Project Geologist ��9Q�pFE5510y <br /> Diane M. Lundqui . P.E. Nps c46725 i <br /> Senior Engineer <br /> C46725 <br /> OF CA�i4�R <br /> i <br /> Attachments j <br /> Plate 1 - Vicinity Map <br /> Plate 2 - Site flan <br /> Figure 2- Site Layout/Former Sampling Location(Aegis Environmental) <br /> I <br /> Appendix A-Tri-Regional Guidelines <br /> Appendix B -Soil Volume Calculations <br /> cc: Mr. R. Jeff Granberry, Shell Oil Products Company <br /> Mr, Jeff Byrarn, Shell Oil Products Company <br /> Ms- Elizabeth Thayer,Regional Water Quality Control Board,Central Valley Region <br /> I <br /> I <br /> 96378 4 <br /> 1 <br /> ' F <br />
The URL can be used to link to this page
Your browser does not support the video tag.