Laserfiche WebLink
en viros® <br /> Sample results and a waste profile form will be submitted to Forward Landfill in Stockton, <br /> California Upon acceptance, the soil will be transported to Forward by Manley and Sons <br /> Trucking of Sacramento, California <br /> Task 7 - Report Preparation <br /> Following the receipt of chemical analytical data, Enviros will prepare a Tank Removal <br /> Report documenting field activities and presenting chemical analytical results <br /> Scheduling <br /> Construction activities are scheduled to begin November 18, 1996 The corrective action <br /> phase of this work (tank removal and excavation and disposal of soil) is scheduled to be <br /> completed within the first three weeks of the project (i e by December 6, 1996) <br /> Completion of the entire project and re-opening of the station is scheduled to be complete <br /> by December 27, 1996 Weather and unforeseen construction conditions may affect this <br /> schedule <br /> If you have any questions regarding the contents of this document, please call Diane <br /> Lundquist at (707) 935-4852 <br /> Sincerely, <br /> Enviros, Inc <br /> AW <br /> a gtf <br /> Vs'm <br /> eely <br /> fol"— <br /> Project Geologist �o��gfESS�Qygl <br /> Diane M Lundqu t, P E <br /> Senior Engineer NO C46725 <br /> C46725 st CIvk <br /> qF£OF CAUi4� <br /> Attachments <br /> Plate 1 - Vicinity Map <br /> Plate 2 - Site Plan <br /> Figure 2 - Site Layout/Former Sampling Location (Aegis Environmental) <br /> Appendix A- Tri-Regional Guidelines <br /> Appendix B - Soil Volume Calculations <br /> cc Mr R Jeff Granberry, Shell Oil Products Company <br /> Mr Jeff Byram, Shell Oil Products Company <br /> • Ms Elizabeth Thayer, Regional Water Quality Control Board, Central Valley Region <br /> 96378 4 <br />