Laserfiche WebLink
9 Zone of influence calculated and assumptions used for the subsurface remediation system and <br /> the zone of capture attained for the sort and groundwater remediation system; <br /> A 5-day SVE test was conducted at the site during November 2001 A table and map showing the <br /> radius of influence calculated during this test are included in Attachment E <br /> 10. Reportslinformation, <br /> A table listing reports and correspondence is included below All available boring logs and well <br /> construction details are included in Attachment F <br /> Date Title/Subject Company <br /> 9/20/02 Groundwater Monitoring Report—Third Quarter 2002 Cambria <br /> 7/22/02 Groundwater Monitoring Report—Second Quarter 2002 Cambria <br /> 5/17/02 First Quarter 2002 Groundwater Monitoring Report and Closure Cambria <br /> Request <br /> 5/17/02 Site Investigation and Soil Vapor Extraction Test Report Cambria <br /> 9/15/00 - Groundwater Monitoring Report—Second Quarter 2000 through Cambria <br /> 2/14/02 Fourth Quarter 2001 <br /> 12/10/01 Soil Remediation Work Plan Addendum Cambria <br /> 9/26/01 Work Plan Approval Letter SJCPHS-EHD <br /> 8/10/01 Completion of 13267 Order Requirements CVRWQCB <br /> 7/26/01 Soil Remediation Work Plan Cambria <br /> 7/2/01 Summary Letter—June 19, 2001 Meeting SJCPHS-EHD <br /> 6/25/01 Site Investigation Report Cambria <br /> 4117/01 CPT Site Investigation Gregg <br /> 4/4/01 Work Plan Approval SJCPHS-EHD <br /> 3/28/01 Revised Site Investigation Work Plan Cambria <br /> 2/9/01 Response Letter Equiva <br /> 1/23/01 Work Plan Approval SJCPHS-EHD <br /> 12/18/00 Site Investigation Work Plan Cambria <br /> 12/11/00 Order to Submit Technical Report CVRWQCB <br /> 11/20/00 Certified List of Record Fee Title Owner Cambria <br /> 1118100 Work Plan Approval SJCPHS-EHD <br /> 10/23/00 Site Investigation Work Plan Cambria <br /> 10/16/00 Work Plan Extension Granted SJCPHS-EHD <br />