Laserfiche WebLink
n 0 <br /> requirements prior to design and construction of any proposed onsite improvements. Soil and <br /> groundwater generated from excavations at the Site may require treatment and/or disposal. <br /> Open cases regarding unauthorized releases from fuel USTs are not referenced within the site vicinity. <br /> An active Chevron service station, Map ID No. I, is loca ed adjacent and east of the Site. Due to the <br /> lack of documented soil and groundwater impacts at the Chevron facility, and the downgradient <br /> location from the Site,the Chevron facility has a low potential of impacting the Site. <br /> i <br /> A review of previous surveys and the results of the building surveys performed at the Site by <br /> i <br /> Geocon, indicate the presence of ACBMs in the office, equipment building, warehouse and gas <br /> house. LCPs were further identified in the office, equipment building, warehouse, gas house and <br /> sealand storage containers. Based on our findings, Geoco recommends the following: <br /> • Retain a registered asbestos abatement contractor to remove and dispose of ACBM identified <br /> during this survey that will be impacted by renovatior or demolition activities. <br /> • Notify contractor(s) that will be conducting renovation work and related activities of the <br /> presence of ACBM and LCP in their work areas and instruct the contractor(s) not to disturb <br /> ACBM or LCP during their work (i.e., provide the contractor[s] with a copy of this report and a j <br /> list of ACBM removed by the asbestos abatement co tractor during any abatement activities). <br /> • Treat all paints at the Site as lead-containing for purToses of determining the applicability of the <br /> Cal./OSHA lead standard during any future maintenance, renovation, and demolition activities. <br /> This recommendation is based on LCP sample results, the age of the buildings, and the fact that <br /> lead was a common ingredient of paints manufacturec before 1978. <br /> • Implement interim controls to maintain identified AC 3Ms and LCPs. <br /> I <br /> I <br /> I <br /> i <br /> I <br /> Project No.S8225-06-146 - 28 - May 25,2001 <br />