5.0 Schedule <br /> •IT is prepared to initiate the utility survey on May 20, 002 and the drilling on May 31, 2002 <br /> pending Caltrans and Regulatory approval of the Work Aan and health and safety plan. It is <br /> anticipated that the utility survey can be completed in approximately one day and the drilling can <br /> be completed in approximately two days. Samples wil be submitted to the laboratory within <br /> 48 hours of collection. The laboratory analyses will be conducted on a normal turn around basis. <br /> Following receipt of all analytical data, it is anticipated that a draft report documenting the <br /> findings of the investigation will be submitted 10 working days after the completion of the work. <br /> j I <br /> It <br /> � Y <br /> Y <br /> I <br /> Y I <br /> I <br /> I <br /> � 3 <br /> " •I <br /> I <br /> r� <br /> h <br /> IMCRFPftOOMMOMSaCDM002%PRJkPJM 183-SO4.2ab.dw <br /> 5-1 <br />