My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KROHN
>
2005
>
3500 - Local Oversight Program
>
PR0518440
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 8:45:03 PM
Creation date
2/10/2020 4:39:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0518440
PE
3030
FACILITY_ID
FA0013911
FACILITY_NAME
CALTRANS TRACY MAINTENANCE STATION
STREET_NUMBER
2005
STREET_NAME
KROHN
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
2005 KROHN RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 Scope of Work <br /> To achieve the project objective, the following scope Df work will be conducted: <br /> 1. Permitting and Mobilization <br /> 2. Preparation of Workplan and Health and Safety Plan <br /> r <br /> ' 3. Field Investigation <br /> 4. Laboratory Analyses <br /> r <br /> 5. Investigation-Derived Waste Disposal <br /> 6. Site Investigation Report Preparation <br /> 4.1 Permitting and Mobilization <br /> t A drilling permit will be obtained from the San Joaquin County Environmental Health <br /> Department. A Caltrans encroachment permit is r of required. All work will be conducted <br /> within Caltrans right-of-way. Underground Sery ce Alert (USA) will be notified of the <br /> s <br /> subsurface investigation at least 48 hours prior to initiation of the investigation. <br /> Margaret Lagorio and Michael Infurna of the San oaquin Environmental Health Department <br /> ,. (SJEHD), Elizabeth Janes of the USEPA Region 9 Groundwater Office, Martha Adams of IT and <br /> Saiyed Ali of Caltrans attended a pre-work site visit on April 23, 2002. Items discussed and <br /> reviewed during the meeting included the scope of work, the site visit checklist, and the project <br /> ° schedule. Michael Infurna, Martha Adams and Sa yed Ali attended a follow-up site visit on <br /> .t . <br /> December 27, 2002 to mark proposed boring locations. <br /> 4.2 Preparation of Workplan and Health and Safety Plan <br /> This Workplan was prepared to present the scope of work and the procedures to be used in the <br /> t , <br /> field. As discussed in following sections, this Wo kplan also provides information regarding <br /> laboratory analyses, investigation-derived waste, and report preparation. <br /> A site-specific health and safety plan will be prepared in accordance with 29 CFR 1910.120. <br /> *— The health and safety plan includes safety procedures for work to be performed at the site, <br /> chemical hazard information, site safety officers, and preferred medical emergency locations. <br /> 1i <br /> •IWCAFPTICOMMOMsacAPMOPA,APdaM M5aaa,2ab.dac <br /> 4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.