My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2003 FEASABILITY STUDY REPORT AND SITE ASSESSMENT WORK PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2900 - Site Mitigation Program
>
PR0542464
>
ARCHIVED REPORTS_2003 FEASABILITY STUDY REPORT AND SITE ASSESSMENT WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2020 6:58:46 PM
Creation date
2/10/2020 4:41:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2003 FEASABILITY STUDY REPORT AND SITE ASSESSMENT WORK PLAN
RECORD_ID
PR0542464
PE
2960
FACILITY_ID
FA0024404
FACILITY_NAME
CHEVRON FUEL TERMINAL 1001621
STREET_NUMBER
22888
STREET_NAME
KASSON
STREET_TYPE
RD
City
BANTA
Zip
95304
APN
23906015, 16, 17
CURRENT_STATUS
01
SITE_LOCATION
22888 KASSON RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2003 Site Assessment Report <br /> - - <br /> July 18, 2003 S E C O R - -- <br /> Page ii <br /> is <br /> 8.0 POTENTIAL IMPACTS OF REMEDIAL ACTIONS..................................................22 <br /> 8.1 Groundwater Barrier...............................................................................................................22 <br /> 8.2 Hydraulic Control Line............................................................................................................22 <br /> 8.3 Combination of Groundwater Barrier and Hydraulic Control Line..........................................22 <br /> 8.4 Groundwater oxygenation System.........................................................................................22 <br /> 9.0 ESTIMATES PROJECT SCHEDULE FOR EACH ALTERNATIVE..........................23 <br /> 9.1 Groundwater Barrier...............................................................................................................23 <br /> 9.2 Hydraulic Control Line............................................................................................................23 <br /> 9.3 Combination of Groundwater Barrier and Hydraulic Control Line..........................................23 <br /> 9.4 Groundwater oxygenation System.........................................................................................23 <br /> 10.0 PREFERRED ALTERNATIVE ...............................................................................24 <br /> 11.0 SITE ASSESSMENT WORK PLAN.......................................................................24 <br /> 11.1 Scope of the Assessment......................................................................................................24 <br /> 11.2 Work Activities........................................................................................................................24 <br /> 11.3 Site Safety Plan......................................................................................................................24 <br /> 11.4 Permitting...............................................................................................................................25 <br /> 11.5 Soil Boring/Temporary Well Installation and Sampling..........................................................25 <br /> 11.6 Soil Sampling.........................................................................................................................25 <br /> 11.7 Groundwater Sampling..........................................................................................................25 <br /> • 11.8 Report.....................................................................................................................................25 <br /> 11.9 Quality Assurance/Quality Control.........................................................................................26 <br /> 11.9.1 Field QA/QC................................................................................................................26 <br /> 11.9.2 Laboratory QA/QC.....................................................................................................26 <br /> 11.10 Schedule._.._.,.____................ ......*'***"*.......*****....... 26 <br /> 12.0 REFERENCES.........................................................................................................1 <br /> TABLES <br /> Table 1 - Water Wells Within One-Mile Radius of the Site <br /> Table 2 - AT123D Groundwater Modeling Input Parameters <br /> Table 3 - AT123D Modeling Results <br /> LIST OF FIGURES <br /> Figure 1 - Site Location Map <br /> Figure 2 - Site Plan with Proposed Soil Boring Locations <br /> Figure 3 - Generalized Geologic Cross-Section A-A' <br /> Figure 4 - Generalized Geologic Cross-Section B-B' <br /> Figure 5 - Rose Diagram —Shallow Groundwater <br /> Figure 6 Topographical Map <br /> Figure 7 - Profile of Monitoring Well Screen Intervals <br /> • Figure 8 Process Flow Diagram <br /> Figure 9 Temporary Well Diagram <br /> I:\Chevron\1001621\REPORTS\2003\2003FS\FS 2003 revD.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.