Laserfiche WebLink
' Cleanup Plan S E C 0 R - --- <br /> October 27, 2003 <br /> Page ii <br /> • <br /> ' LIST OF TABLES <br /> ' Table 1 - Water Wells Within One-Mile Radius of the Site <br /> LIST OF FIGURES <br /> ' Figure 1 - Site Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Generalized Geologic Cross-Section A-A' <br /> ' Figure 4 - Generalized Geologic Cross-Section B-B' <br /> Figure 5 - Water Wells Within One-Mile of Site <br /> Figure 6 - Profile of Monitoring Well Screen Intervals <br /> ' Figure 7 - Site Plan with Excavation and Groundwater Oxygenation System Layout <br /> Figure 8 Groundwater Oxygenation System Process Flow Diagram <br /> Figure 9 - Cleanup Plan Schedule <br /> ' LIST OF ATTACHMENTS <br /> Attachment A - Cleanup and Abatement Order(CAO) No. R5-2002-0718 <br /> Attachment B - CRWQCB-CVR, Cleanup Plan Guidance, dated August 21, 2003 <br /> Attachment C - Historical Soil Concentration Figures <br /> '• Attachment D - Second Quarter 2003 Groundwater Elevation and Analytical Figures <br /> Attachment E - Field and Laboratory Procedures <br /> • <br /> ' I:\Chevron\1001621\REPORTS\2003\2003-Cleanup Plan\Cleanup Plan.doc <br />